ROUGH-IN INSTRUCTIONS
FIGURE 1
ROUGH-IN
DIMENSIONS
* This | ||
measurement | ||
Min. | ||
must be | ||
taken from | ||
| ||
| top of | |
| floor | |
| plate |
4”
4”
NOTE: For proper combustion, make sure units are level, front to back and side to side.
Screw
Front
Panel
Plaster
Ground
FIGURE 5A - DRY WALL
Plaster
Screw
Front
PlasterPanel
Ground
FIGURE 5B - PLASTER WALL
STEP 4.Remove double ceiling plate between studs. Install one ceiling plate spacer across the cut out in ceiling plate. Install vent pipe into position, be sure to lock bottom of vent pipe into the base plate. Nail second ceiling plate spacer in place. (See Figure C, Page 6).
STEP 5.If the vent continues through additional stories within the
| Installation of | Firestop spacers | |
| supplied by | ||
| vent for each subsequent | ||
| manufacturer of | ||
| ceiling or floor level | ||
| |||
| of | ||
|
| ||
| buildings |
| Plate cut away to |
|
|
| provide passage of |
|
|
| |
|
|
| Nail firestop |
|
|
| spacer securely |
|
|
|
|
FIGURE D |
|
| |
|
|
| |
| VENT INSTALLATION | LISTED | |
|
|
| VENT TOP |
|
| 2 FT. MIN. |
|
|
|
| STORM COLLAR |
|
|
| ROOF |
|
|
| FLASHING |
| CEILING PLATE | OVAL TO | |
| ROUND ADAPTER | ||
| SPACERS | ||
|
| ||
|
|
| LISTED “BW” |
|
|
| VENT PIPE |
| 12 FT. | CEILING | BASE PLATE |
| MIN. | ||
|
| ||
| PLATE |
| |
|
| HEADER PLATE | |
|
| SPACER | |
|
| LANCES |
|
|
|
| 2 X 4 WALL |
|
|
| STUDS |
|
|
|
|
FIGURE 2 - VENT INSTALLATION
Page 7