Honeywell PRO22ENC1, PRO22ENC2 installation manual Installation Diagram

Page 10
Installation Diagram

PRO-2200 Enclosure PRO22ENC1 & PRO22ENC2

Installation Guide

11

7.The remainder of the panels can be manually wired for power and RS-485 communications using 18 AWG wire. The wires will be daisy-chained from one panel to the next so the power and the communications are wired in parallel. PRO22DCC is available as an option to be purchased with the equipment. This will reduce wiring time in the field since the power and RS-485 communications between panels is factory- wired in a harness that plugs into the bottom two connectors on each panel. The only field wiring required is the two wiring connections of the red and black 12 VDC cables connecting the PRO22DCC and the PRO22E1PS power supply.

Installation Diagram

 

(0,051)

(0,045)

(0,196)

(0,032)

 

 

 

(0,229)

 

(0,045)

 

 

 

(0,035)

 

 

(0,076)

 

 

(0,098)

 

 

 

(0,330)

 

(0,203)

(0,203)

(0,307)

(0,353)

(0,307)

(0,230)

(0,406)

(0,432)

(0,480)

 

(0,051)

(0,045)

 

 

(0,196)

(0,032)

 

 

 

(0,229)

 

(0,045)

 

 

 

(0,035)

 

 

(0,076)

 

 

(0,098)

 

 

 

(0,330)

 

(0,203)

(0,203)

(0,307)

(0,353)

(0,307)

PRO22ENC1

(0,025)

(0,025)

(0,025)

(0,042)

(0,051)

PRO22ENC2

(0,025)

(0,025)

(0,025)

(0,042)

(0,051)

(0,230)

(0,406)

(0,432)

Image 10
Contents Part Number PRO22ENC1 PRO22ENC2 PRO-2200 Enclosure Installation ManualTD1138 rev0801 Contents Fire Safety and Liability Notice Warnings and CautionsBUT NOT BOTH Page Disclaimer Unpacking ProcedureProduct Liability Mutual Indemnification Shipping Instructions Limited WarrantyTo ship equipment back to Engineered Systems Confidentiality PRO-2200Enclosure DescriptionMaintenance DimensionsPower Supply Installation InstructionsInstallation Diagram PC Minimum Requirements UL1076 SetupReceiving Unit minimum configuration Peripheral Hardware RequirementsA.Select Full Installation ProceduresOther UL1075 Notes B.Select SQL for DatabaseSecond PC Installation Enterprise Manager SetupDTS Package Verification Pre-RedundancyVerificationInterim Steps Before Full Redundancy Verification Example #1 Power Supply DimensionsRedundant Test Examples Example #2Dimensions Installation DiagramPower Supply Enclosure Installation GuideInstallation Installation InstructionsCable Specifications ESG Cable Part Numbers Installation Guide PRO-2200Enclosure PRO22ENC1 & PRO22ENC2Installation Guide PRO-2200Enclosure PRO22ENC1 & PRO22ENC2Installation Guide PRO-2200Enclosure PRO22ENC1 & PRO22ENC2Honeywell Security & Data Collection 2700 Blankenbaker Pkwy, Suite Louisville, KY