Honeywell PRO22ENC2 Redundant Test Examples, Power Supply Dimensions, Example #1, Example #2

Page 15

16

Installation Guide

PRO-2200 Enclosure PRO22ENC1 & PRO22ENC2

Redundant Test Examples

NOTE: Stop watch needed for all three test examples.

Example #1

1.Use the MAIN PC’s OFF button to shut it down. Turn on the REDUNDANT PC and start the stop watch.

2.Log into NT with Administrator rights.

3.Launch the User Interface and log in as ADMIN.

4.When the Alarm View pops up with Poll Response Normal, stop the stop watch. This time represents the amount of time that has passed since the MAIN PC went down.

Example #2

1.Unplug the power to the MAIN PC. Turn on the REDUNDANT PC and start the stop watch.

2.Log into NT with Administrator rights.

3.Launch the User Interface and log in as ADMIN.

4.When the Alarm View pops up with Poll Response Normal, stop the stop watch. This time represents the amount of time that has passed since the MAIN PC went down.

Example #3

1.Unplug the network cable from the HUB for the MAIN PC. Turn on the REDUN- DANT PC and start the stop watch.

2.Log into NT with Administrator rights.

3.Launch the User Interface and log in as ADMIN.

4.When the Alarm View pops up with Poll Response Normal, stop the stop watch. This time represents the amount of time that has passed since the MAIN PC went off line.

Power Supply Dimensions

Height: 15.5" (39.4cm)

Width: 12" (30.5cm)

Depth: 4.5" (11.43cm)

Color: Grey

Installation holes: Four hangers in a rectangular pattern 13.5" H x 9.825" W (34.3cm H x 25cm W)

Image 15
Contents PRO-2200 Enclosure Installation Manual Part Number PRO22ENC1 PRO22ENC2TD1138 rev0801 Contents Warnings and Cautions Fire Safety and Liability NoticeBUT NOT BOTH Page Unpacking Procedure DisclaimerProduct Liability Mutual Indemnification Limited Warranty Shipping InstructionsTo ship equipment back to Engineered Systems Confidentiality Description PRO-2200EnclosureInstallation Instructions DimensionsPower Supply MaintenanceInstallation Diagram Peripheral Hardware Requirements UL1076 SetupReceiving Unit minimum configuration PC Minimum RequirementsB.Select SQL for Database ProceduresOther UL1075 Notes A.Select Full InstallationEnterprise Manager Setup Second PC InstallationPre-RedundancyVerification DTS Package VerificationInterim Steps Before Full Redundancy Verification Example #2 Power Supply DimensionsRedundant Test Examples Example #1Installation Guide Installation DiagramPower Supply Enclosure DimensionsInstallation Instructions InstallationCable Specifications ESG Cable Part Numbers PRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation GuidePRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation GuidePRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation Guide2700 Blankenbaker Pkwy, Suite Louisville, KY Honeywell Security & Data Collection