Honeywell PRO22ENC2 UL1076 Setup, PC Minimum Requirements, Peripheral Hardware Requirements

Page 11
UL1076 Setup

12Installation Guide PRO-2200 Enclosure PRO22ENC1 & PRO22ENC2

UL1076 Setup

PC Minimum Requirements

Two required:

 

• 500 Mhz

• 128Mb RAM

• 9.1Gb hard drive

• CD ROM

• 10/100 TX network card

• 17” SVGA Monitor

Peripheral Hardware Requirements

 

UL approved network HUB with at least 4 ports.

UL approved CAT 5 network cable and connectors.

PRO22IC Controller and accompanying I/O boards.

Cobox network card (PRO22IC mounted)

Operating System Requirements

NT Server 4.0 or better.

NT Service Pack #5 or higher.

Software Packages Required

SQL Server 7.0

SQL Server Service Pack #1 or higher.

WIN-PAK PRO 3.0 with SQL database selection.

Receiving Unit minimum configuration

PRO22ENC1 or PRO22ENC2 cabinet

PRO22ULPS (ALTRONIX AL400 ULX) power supply with 40 AH battery back up

PRO22IC controller panel

PRO22IN input panel

PRO22EN Cobox Ethernet card

PRO22ENSP Tripp Lite DNET1 Ethernet surge protector

The following priority of incoming signals must be used for UL1076

1.Fire alarm (N/A) WIN PAK PRO is not certified for fire alarm supervision

2.Hold up / Panic alarm

3.Burglar alarm

Image 11
Contents TD1138 rev0801 PRO-2200 Enclosure Installation ManualPart Number PRO22ENC1 PRO22ENC2 Contents BUT NOT BOTH Warnings and CautionsFire Safety and Liability Notice Page Product Liability Mutual Indemnification Unpacking ProcedureDisclaimer To ship equipment back to Engineered Systems Limited WarrantyShipping Instructions Confidentiality Description PRO-2200EnclosureInstallation Instructions DimensionsPower Supply MaintenanceInstallation Diagram Peripheral Hardware Requirements UL1076 SetupReceiving Unit minimum configuration PC Minimum RequirementsB.Select SQL for Database ProceduresOther UL1075 Notes A.Select Full InstallationEnterprise Manager Setup Second PC InstallationInterim Steps Before Full Redundancy Verification Pre-RedundancyVerificationDTS Package Verification Example #2 Power Supply DimensionsRedundant Test Examples Example #1Installation Guide Installation DiagramPower Supply Enclosure DimensionsInstallation Instructions InstallationCable Specifications ESG Cable Part Numbers PRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation GuidePRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation GuidePRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation Guide2700 Blankenbaker Pkwy, Suite Louisville, KY Honeywell Security & Data Collection