Honeywell PRO22ENC1, PRO22ENC2 Other UL1075 Notes, Procedures, A.Select Full Installation

Page 12

PRO-2200 Enclosure PRO22ENC1 & PRO22ENC2

Installation Guide

13

4.Watchman tour

5.Fire alarm supervision (N/A) WIN PAK PRO is not certified for fire alarm supervision

6.Burglar alarm supervision

7.Industrial supervision

8.Other supervisory services

NOTE: 2 and 3 may have equal priority: 5 and 6 may have equal priority & 7 and 8 may have equal priority

Other UL1075 Notes

All alarms and troubles must be acknowledged by attending guard.

Reports of all alarms and troubles must be printed and stored at least once per week.

When communications are disrupted from the protected area unit to the Central Supervisory station all panels must be buffered. They must transmit all stored alarms and troubles to the Central Supervisory Station when communications are restored.

If Cameras are used they must be UL approved. Camera operation was not verified by UL.

Guard Tour was not verified by UL to NFPA 72 standards

Exit and Entry Delay can not exceed 60 seconds. Polling of a receiving unit may not exceed 200 seconds

Procedures

1.Configure the PC’s by installing the NT Server 4.0.

A.PC names should be unique and described with Alpha characters.

B.IP addresses should be unique and have the same Subnet Mask.

C.Each PC should be of the same workgroup name.

2.Install NT Service Pack #5 or higher.

3.Install SQL Server 7.0. Select either NT Authentication or Local System, but be consistent with both PC installations.

4.Install SQL Server 7.0 Service Pack #1.

5.Setup the Cobox PRO22EN per it’s installation manual.

6.Install the WIN-PAK PRO Software on the MAIN PC.

A.Select Full Installation.

B.Select SQL for Database.

C.Install the Desktop Icons.

D.Upon reboot of the PC, stop all the WIN-PAK PRO Services.

Image 12
Contents PRO-2200 Enclosure Installation Manual Part Number PRO22ENC1 PRO22ENC2TD1138 rev0801 Contents Warnings and Cautions Fire Safety and Liability NoticeBUT NOT BOTH Page Unpacking Procedure DisclaimerProduct Liability Mutual Indemnification Limited Warranty Shipping InstructionsTo ship equipment back to Engineered Systems Confidentiality PRO-2200Enclosure DescriptionDimensions Power SupplyMaintenance Installation InstructionsInstallation Diagram UL1076 Setup Receiving Unit minimum configurationPC Minimum Requirements Peripheral Hardware RequirementsProcedures Other UL1075 NotesA.Select Full Installation B.Select SQL for DatabaseSecond PC Installation Enterprise Manager SetupPre-RedundancyVerification DTS Package VerificationInterim Steps Before Full Redundancy Verification Power Supply Dimensions Redundant Test ExamplesExample #1 Example #2Installation Diagram Power Supply EnclosureDimensions Installation GuideInstallation Installation InstructionsCable Specifications ESG Cable Part Numbers Installation Guide PRO-2200Enclosure PRO22ENC1 & PRO22ENC2Installation Guide PRO-2200Enclosure PRO22ENC1 & PRO22ENC2Installation Guide PRO-2200Enclosure PRO22ENC1 & PRO22ENC2Honeywell Security & Data Collection 2700 Blankenbaker Pkwy, Suite Louisville, KY