Honeywell PRO22ENC2, PRO22ENC1 installation manual Installation Instructions

Page 17
Installation

18

Installation Guide

PRO-2200 Enclosure PRO22ENC1 & PRO22ENC2

Installation

Installation Instructions

1.Install the PRO22ULPS (Altronix AL400ULX) power supply and battery enclosure per the supplied instructions.

2.Measure and install four mounting screws with heads smaller than .4" (1cm) using proper techniques for the material on which the PRO22ENC1 or PRO22ENC2 is being mounted. Use a rectangular screw pattern 12.1" H x 16" W (0.307m H x 0.4064m W). Leave the screws exposed approximately 1/2" (1.27cm).

3.Open the door of the enclosure and place the hanging slots over the mounting screws. Push the enclosure over the mounting screws and allow the screws to slide into the slots. Finish tightening the mounting screws to securely hold the enclosure.

4.Run all appropriate wiring to the case. All cable shields should tie to the grounding lug found on the top of the enclosure.

5.Install the required panels into the runners. The PRO22IC should be placed in the right-most position. The PRO22EN ethernet card should be mounted on the PRO22IC prior to mounting in the enclosure. See panel instructions.

6.Wire the readers, input and output connections.

7.CHECK ALL CONNECTIONS PRIOR TO POWERING UP THE ENCLOSURE AND PANELS.

8.Wire the 12VDC, AC Fail, Battery Fail and tamper switch from the AL400ULX to the enclosure. Make sure that the power supply is not powered up at the time.

9.Wire the 12VDC to the Panel on the far right first making sure that the polarity of the wires are correct.

10.Wire the tamper switch, AC Fail and Battery Fail to assigned inputs.

11.Wire the PRO22ENC1 or PRO22ENC2 tamper switch to the tamper input located on the first panel on the right.

12.The remainder of the panels can be manually wired for power and RS-485 communica- tions using 18 AWG wire. The wires will be daisy-chained from one panel to the next so the power and the communications are wired in parallel.

They may also be wired using the Auxiliary Rack Harness purchased with the equip- ment. This will reduce wiring time in the field since the power and RS-485 communica- tions between panels is factory-wired in a harness that plugs into the bottom two connectors on each panel. The only field wiring required is the two wiring connections of the red and black 12VDC cables connecting the Auxiliary Rack Harness and the Rack Power Supply Harness.

13.CHECK ALL CONNECTIONS PRIOR TO POWERING UP THE ENCLOSURE AND PANELS.

14.Wire the TCP/IP connection to the network HUB.

Image 17
Contents TD1138 rev0801 PRO-2200 Enclosure Installation ManualPart Number PRO22ENC1 PRO22ENC2 Contents BUT NOT BOTH Warnings and CautionsFire Safety and Liability Notice Page Product Liability Mutual Indemnification Unpacking ProcedureDisclaimer To ship equipment back to Engineered Systems Limited WarrantyShipping Instructions Confidentiality Description PRO-2200EnclosurePower Supply DimensionsMaintenance Installation InstructionsInstallation Diagram Receiving Unit minimum configuration UL1076 SetupPC Minimum Requirements Peripheral Hardware RequirementsOther UL1075 Notes ProceduresA.Select Full Installation B.Select SQL for DatabaseEnterprise Manager Setup Second PC InstallationInterim Steps Before Full Redundancy Verification Pre-RedundancyVerificationDTS Package Verification Redundant Test Examples Power Supply DimensionsExample #1 Example #2Power Supply Enclosure Installation DiagramDimensions Installation GuideInstallation Instructions InstallationCable Specifications ESG Cable Part Numbers PRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation GuidePRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation GuidePRO-2200Enclosure PRO22ENC1 & PRO22ENC2 Installation Guide2700 Blankenbaker Pkwy, Suite Louisville, KY Honeywell Security & Data Collection