New Buck Corporation 1110 manual Ventilation Air From Outdoors

Page 18
VENTILATION AIR FROM OUTDOORS

VENTILATION AIR FROM OUTDOORS

Provide extra fresh air by using ventilation grills or ducts. You must provide two permanent openings: one within 12" of the ceiling and one within 12" of the floor. Connect these items directly to the outdoors. These spaces include attics and crawl spaces. Follow the National Fuel Gas Code NFPA 54/ANSI Z223.1, Section 5.3, “Air For Combustion and Ventilation” for required size of ventilation grills or ducts.

IMPORTANT: Do not provide openings for inlet air into attic if attic has a thermostat- controlled power vent. Heated air entering the attic will activate the power unit.

VENTILATEDManual backgroundATTICManual backgroundManual background

OUTLET AIR

OUTLET AIR

TO ATTIC

 

 

TO

 

CRAWL

 

SPACE

INLET AIR

 

INLET AIR

VENTILATED

CRAWL SPACE

Figure 9

16

Image 18
Contents Manufacturer NEW BUCK CORPORATION P.O. Box NEW BUCK CORPORATIONMODEL 1110 VENT-FREEGAS HEATER 8000 Highway 226 South Spruce Pine, NCPage TABLE OF CONTENTS Page SAFETY INFORMATION WARNINGS Do not try to light any appliance 22.”WARNING Failure to keep the primary air openings of the burners clean may result in sooting and property damage.” PRODUCT IDENTIFICATION SAFETY DEVICE PRODUCT FEATURESUNPACKING PIEZO IGNITION SYSTEMMINIMUM CLEARANCES TO COMBUSTIBLE CONSTRUCTION 2.Freestanding heater with optional pedestal INSTALLATION1.Wall Mounted 3.Freestanding with optional wooden mantelCLEANING INFORMATION FREESTANDING WITH OPTIONAL PEDESTAL INSTALLATION FREESTANDING OPTIONAL WOODEN MANTEL INSTALLATIONOPTIONAL “L” BRACKETS 2 AND SCREWS 2 PRO PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIRFLOW FOR HEATER LOCATIONVent-freeheater VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGVENTILATION AIR FROM OUTDOORS GAS CONNECTION FLAMECONNECTING TO A GAS SUPPLY Propane Supply TankExternal Regulator Vent Pointing Down Installation must include manual shutoff valve and plugged 1/2 NPT tap. Locate NPT tap within reach for test gauge hook-up.NPT tap must be upstream from unit GAS PRESSURE CHECK LOG PLACEMENT FOR Logs are shipped secured in unitFront View of Logs FOR YOUR SAFETY, READ BEFORE LIGHTING LIGHTING INSTRUCTIONS MODULATING VALVEMAXITROLOPERATING INSTRUCTIONS for “LOW” LIGHTING INSTRUCTIONSto IGNITE and for “HIGH”TO TURN OFF GAS TO APPLIANCE IGNITER ELECTRODE THERMO-COUPLEO.D.S PILOT BURNER MANUAL LIGHTING PROCEDURE THERMOSTAT CONTROL OPERATIONNATURAL FLAME CHECKFLAME PROPANEFigure 1815 - Correct Burner Flame Pattern BURNER FLAME PATTERNCORRECT FLAME PATTERN AT HIGH POSITION INCORRECT FLAME PATTERN AT HIGH POSITIONMOTOR WIRING DIAGRAMPOWER CORD JUMPERTHERMOSTATREPAIR PARTS SERVICINGIMPORTANT SAFEGUARDS CLEANINGTROUBLE-SHOOTING OBSERVED PROBLEMSOLUTION POSSIBLE1.Control knob is not fully pressed in Delayed ignition of burner 1. Heater produces a clinking TECHNICAL SERVICE MODELMODULATING VALVE PARTS LIST BLOWN UP VIEW OF HEATER, FAN MOTOR, AND ALL REMOVABLE PARTSPARTS LIST Maxitrol ValveBLOWN UP VIEW OF BURNER ASSEMBLY LIMITED WARRANTY ON VENT-FREEGAS LOG HEATER NEW BUCK CORPORATION