Heat & Glo LifeStyle AT-GRAND manual Minimum Height from Roof to Lowest Discharge Opening

Page 10

7

WARNING

MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR VENT HEIGHT ABOVE THE ROOF TOP. THESE MINIMUM HEIGHTS ARE NECESSARY IN THE INTEREST OF SAFETY. FIGURE 2 SHOWS MINIMUM HEIGHTS, PROVIDED THE TERMINATION CAP IS AT LEAST 8- FEET FROM A VERTICAL WALL.

NOTE: This also pertains to vertical vent systems installed on the outside of the building.

TERMINATION

C A P

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 2. Minimum Height from Roof to Lowest Discharge Opening

Image 10
Contents Heat-N-Glo Fireplace Safety and Warning Information Table of Contents Safety and Warning InformationApprovals and Codes CodesGetting Started Venting and Installation Diagram of the AT-GRAND Vent System Approvals Installing the Insert Step Vent SystemVent System Installation Precautions Horizontal VentingConnecting the Vent Pipe Flex pipes to the starting collars on the unit withMinimum Height from Roof to Lowest Discharge Opening Page Inlet AIR Standing Pilot Ignition System Gas Controls SystemsStep Gas Supply Line Gas Supply LinePressure Natural Gas Propane Step Gas Pressure Requirements Wiring FireplaceAppliance Requirements Optional Accessories Remote Wall SwitchSave the log instructions with this manual Step Installing Logs Ember MaterialPositioning the Logs Placing the Ember MaterialGlass Assembly Step Installing Trim Surrounds Mantel Double-check for faulty components Step Before Lighting Appliance After InstallationReview safety warnings and cautions Double-check for gas leaksAppliance Maintenance Maintaining and Servicing Your ApplianceBurner Flame Patterns Replacement Parts Accessories Standing Pilot OnlyStanding Pilot R T PA R T PAR T N U M B E R S C R IP T IO N