Heat & Glo LifeStyle 6100PLUS Placing the Rock Wool, Placing the Silica Rock Techno Sil

Page 22

Placing the Rock Wool

• Place the silica rock so that it completely covers the ember

• Place a small amount of 1/2 in. diameter pieces (dime-size)

bed. See Figure 10.7.

of rock wool on the burner pan so the rock wool touches but

 

 

 

does not cover the holes in the burner pan. This will provide the

 

 

 

“glowing embers” look. It is not necessary to use the entire bag.

 

 

 

Save the remaining amount for future use. See Figure 10.4.

 

 

 

Figure 10.4 Placing the Rock Wool

Figure 10.7 Placing the Silica Rocks

Placing the Silica Rock (Techno Sil)

You will need to paint the silica rocks with the supplied spray paint to create the most realistic look. See Figures 10.5-10.6.

Figure 10.5 Silica Rocks

Figure 10.6 Painting the Rocks

22

Hearth & Home Technologies • 6100PLUS • 4041-127 Rev D • 09/05

Image 22
Contents Models 6100PLUS Fresh Air Fireplace What to do if you smell gasHomeowner Reference Information Listing Label Information/LocationTable of Contents Appliance Certification High Altitude InstallationsListing and Code Approvals Non-Combustible MaterialsTools and Supplies Needed Design and Installation ConsiderationsGetting Started Inspect the Appliance and ComponentsSelect Appliance Location Framing and ClearancesFire Risk Construct the Appliance Chase Fire Risk Odor RiskClearances Mantel ProjectionsVent Termination Minimum Clearances Termination LocationsFire Risk Explosion Risk Vent Information and Diagrams Fire Risk Fumes RiskAppliance Preparation Securing and Leveling the ApplianceGas Pressure Gas InformationFuel Conversion Gas Connection Gas Leak RiskFire Risk Explosion Risk Asphyxiation Risk Electrical Information Recommendation for WireConnecting to the Appliance Shock Risk Explosion RiskSystem Wiring 6100PLUS RequirementsHRV200PLUS Control Wiring Between R2Appliance Circuit Board Wiring Flame On/Off Wall SwitchOptional Accessories Requirements Electric Embers On/OffJunction Box Installation Junction Box DetailFinishing Facing MaterialLava Rock, Rockwool, Silica Rock Placement Appliance SetupClean the Appliance Remove the Shipping MaterialsPlacing the Rock Wool Placing the Silica Rock Techno SilPlace the Right Front Log Grate and Log AssemblyPlace the Grate Place the Top LogSequence of Operation Appliance ModeOperating Instructions Fire Risk Burn RiskHRV200PLUS Defrost Mode Lighting the Appliance Fire Risk High Temperatures Initial Break-in ProcedureAfter the Appliance is Lit Troubleshooting Troubleshooting GuideCleaning the Burner and Control Compartment Annual MaintenanceEmber Bed Bulb Replacement Maintaining and Servicing the ApplianceThis page intentionally left blank Appliance Dimension Diagram Reference MaterialsService Parts List 6100PLUSRefractory Assembly, Traditional Log Set6100PLUS Description of Part 6100PLUS 6100PLUS-LPSpfl Remote Control Wall SwitchOptional Components Spvn Spwd SpwvArched Cabinet Doors Essence Series Optional Components 6100PLUS 6100PLUS-LP QtyArched Cabinet Doors Prism Series This page intentionally left blank Limited Lifetime Warranty Contact Information