Desa VGMRP, CGMFN, CGMFP, VGMRN If you have not assembled firebox, follow instructions on

Page 11

INSTALLATION

Continued

 

Actual

Framing

Height

23 3/4"

22 1/4"

Front Width

19 3/4"

17 1/2"

Depth

8 7/8"

8 7/8"

Bottom

0"

0"

1.Frame in rough opening. Use dimensions shown in Figure 7 for the rough opening. If installing in a corner, use dimensions shown in Figure 8 for the rough opening. The height is 22 1/4" which is the same as the wall opening above.

2.Install gas piping to fireplace location. This installation includes an approved flexible gas line (if allowed by local codes) after the equip- ment shutoff valve. The flexible gas line must be the last item installed on the gas piping.

3.If you have not assembled firebox, follow instructions on page 6.

4.Carefully set fireplace in front of rough opening with back of fireplace inside wall opening.

5.Attach flexible gas line to fireplace gas regula- tor. See Connecting Fireplace to Gas Supply, page 14.

6.Check all gas connections for leaks. See

Checking Gas Connections, page 15.

IMPORTANT: When finishing your firebox, combustible materials such as wall board, gypsum board, sheet rock, drywall, plywood, etc. may be butted up next to the sides and top edge of the fire- box. Combustible materials should never overlap the firebox front facing.

8 7/8"

221/4"

171/2"

Figure 7 - Rough Opening for Installing

in Wall

WARNING: Do not allow any combustible or noncombustible materials to overlap the firebox front facing.

WARNING: Do not allow noncombustible materials to cover any necessary openings like louvered slots.

WARNING: Never modify or cover the louvered slots on the front of the firebox.

Mantel Clearances for Built-In

Installation

If placing mantel above built-in fireplace, you must meet minimum clearance between mantel shelf and top of fireplace opening.

NOTICE: Surface temperatures of adjacent walls and mantels become hot during operation. Walls and mantels above the firebox may become hot to the touch. If installed properly, these temperatures meet the requirement of the national product standard. Follow all minimum clearances shown in this manual.

NOTICE: If your installation does not meet the minimum clearances shown in Figure 9, page 12, you must do one of the following:

raise the mantel to an accept- able height

remove the mantel

297/8"

211/8"

171/2" 421/4"

Figure 8 - Rough Opening for Installing

in Corner

119315-01A

www.desatech.com

11

Image 11
Contents Shown with Optional Cabinet Mantel/Hearth Base Accessory OWNER’S Operation and Installation ManualTable of Contents Safety Information Unpacking Local CodesProduct Identification Product FeaturesOptional Remote Control Accessories AssemblyProviding Adequate Ventilation Air for Combustion VentilationDetermining if You Have a Confined or Unconfined Space AIR for Combustion VentilationDetermining FRESH-AIR Flow for Fireplace Location Confined and Unconfined SpaceVentilation Air From Outdoors Ventilation AIRVentilation Air From Inside Building Check GAS Type InstallationInstallation Items Fireplace pilot and burner must be at least 18 above floor InstallationBuilt-In Fireplace Installation Fireplace ClearancesIf you have not assembled firebox, follow instructions on Mantel Clearances for Built-In InstallationPlacing Hearth Base Against Wall Route flexible gas line through access hole in hearth basePropane/LP Supply Tank External Regulator Connecting to GAS SupplyNatural Connecting Fireplace to Gas SupplyInstallation Items Needed Propane/LPCorrect all leaks at once Checking GAS ConnectionsTest Pressures Equal To or Less Than Psig 3.5 kPa Installing 9-Volt Battery in Hand-Held Remote Control Unit Optional Wireless hand-held Remote Control AccessoriesPressure Testing Fireplace Gas Connections Installing ReceiverAir conditioning ducts See FigureAs pictured in Figure Must not be lengthenedOperating Fireplace Optional Wall Switch GWMS2 Remote-Ready Models OnlyInstalling LOG SET and Screen For Your Safety Read Before LightingLighting Instructions Operating FireplaceShutting Off Fireplace Manual Lighting ProcedureTo Turn OFF GAS To Appliance Remote-ready ModelsRemote Operation Optional Hand-HeldThermostat Series Model HRC200 and HRC201 Manual ModeAuto Thermostatic Mode On/Off Series Model HRC100 and HRC101Burner Flame Pattern Switch OptionalInspecting Burners Pilot Flame PatternBlow air into the primary air holes on the injector holder Cleaning MaintenanceBurner Injector Holder Pilot Air Inlet Hole If burner flame pattern is incorrect, as shown in FigureCabinet TroubleshootingObserved Problem Possible Cause Remedy LOG SetTroubleshooting White powder residue forming When heated, vapors from Delayed ignition of burnerNoise when burner is lit Observe minimum installaGas leak. See Warning Service Hints SpecificationsWiring Diagram Replacement PartsMANUAL-controlled models Cgmfn and Cgmfp Illustrated Parts Breakdown101629-02 Parts ListIllustrated Parts Breakdown REMOTE-READY Models Equipment Shutoff Valve GA5010 AccessoriesWALL-MOUNT ON/OFF Switch Receiver and HAND-HELD Remote Control KIT HRC100 and HRC101119315-01A Not a UPC

VGMRN, VGMRP, CGMFN, CGMFP specifications

Desa CGMFP, VGMRN, VGMRP, and CGMFN represent a series of cutting-edge developments designed to optimize various aspects of modern technology and infrastructure. These entities focus on enhancing efficiency, sustainability, and overall performance within their respective domains.

Desa CGMFP, or the Comprehensive Green Manufacturing Facility Program, is dedicated to promoting sustainable manufacturing practices. Its primary features involve the integration of green technologies that minimize waste and energy consumption. The program emphasizes the use of renewable energy sources, such as solar and wind, to power manufacturing operations. This initiative not only reduces the carbon footprint of production processes but also helps organizations meet regulatory standards for environmental protection.

VGMRN, which stands for Variable Grid Management and Resource Network, is a sophisticated system designed to enhance the efficiency of energy distribution. It utilizes advanced algorithms and machine learning to manage energy loads dynamically across the grid. One of the standout characteristics of VGMRN is its ability to forecast energy demand patterns, allowing for proactive adjustments to energy supply. This results in minimized downtime and optimized usage of resources, making it an essential component of smart grid solutions.

VGMRP, or Variable Grid Management and Resource Planning, complements the work of VGMRN by focusing on the strategic planning of resource allocation within energy networks. Its core features include predictive analytics and scenario modeling, which empower utilities to simulate various energy distribution scenarios and make informed decisions. This technological approach not only aids in efficient resource use but also supports resilience against fluctuations in energy supply and demand.

Lastly, CGMFN, the Comprehensive Green Manufacturing Framework Network, provides a robust platform for collaboration across industries engaged in green manufacturing. This network facilitates the sharing of best practices, research advancements, and innovative solutions. Key characteristics of CGMFN include a strong emphasis on interdisciplinary cooperation and the promotion of circular economy principles, which encourage the utilization of recycled materials and waste reduction strategies.

Together, these initiatives encapsulate a forward-thinking approach to manufacturing and energy management. They leverage technology and strategic planning to enhance productivity while ensuring that environmental sustainability remains at the forefront of operations. As industries continue to evolve, Desa CGMFP, VGMRN, VGMRP, and CGMFN will play pivotal roles in shaping a greener, more efficient future.