Desa CGMFN, CGMFP, VGMRN, VGMRP installation manual Placing Hearth Base Against Wall

Page 12

INSTALLATION

Continued

Hearth

Pipe and Gas

Electrical

Shutoff Valve

Outlet

Base

 

 

Note:

9"

Mantel Shelf

All vertical 3" measurements 1" are from top of

fireplace 3/4" opening to

bottom of mantel shelf. All measurements are in inches.

"

 

4

 

3 1/

6"

9"

 

18"

 

 

 

 

Figure 10 - Placing Hearth Base Against Wall

Cabinet

Mantel

Side of Firebox

Figure 9 - Minimum Mantel Clearances

for Built-In Installation

OPTIONAL MANTEL Installation Refer to instructions provided with the mantel for assembly. Refer to the following instructions for system installation. Refer to instructions on page 6 for hood assembly.

1. Assemble cabinet mantel as shown in acces- sory instruction sheet.

2. Place hearth base against wall at installation location. Cut an access hole in hearth base to run gas line to fireplace (see Figure 10). Make sure to locate access hole so cabinet mantel will cover it when installed. Note: You can secure base to floor using wood screws. Countersink screw heads and putty over.

3. Route flexible gas line through access hole in hearth base.

4. Center cabinet mantel on hearth base (see Figure 11). Make sure mantel is flush against wall and centered left to right on base.

5. Use hardware provided with mantel accessory to attach mantel assembly to base (see mantel instruction sheet).

6. Attach flexible gas line to fireplace gas regula- tor. See Connecting to Gas Supply, page 13.

7. Check all gas connections for leaks. See Checking Gas Connections, page 15.

8. Carefully insert fireplace into cabinet mantel (see Figure 12). Be careful not to scratch or damage hearth base or cabinet mantel (see manual instruction sheet.

Hearth

Base

Figure 11 - Installing Cabinet Mantel onto

Hearth Base

Cabinet

Mantel

Hearth Base

Figure 12 - Installing Fireplace into

Mantel Assembly

12

www.desatech.com

119315-01A

Image 12
Contents OWNER’S Operation and Installation Manual Shown with Optional Cabinet Mantel/Hearth Base AccessoryTable of Contents Safety Information Local Codes UnpackingProduct Features Optional Remote Control AccessoriesAssembly Product IdentificationAir for Combustion Ventilation Providing Adequate VentilationAIR for Combustion Ventilation Determining FRESH-AIR Flow for Fireplace LocationConfined and Unconfined Space Determining if You Have a Confined or Unconfined SpaceVentilation AIR Ventilation Air From Inside BuildingVentilation Air From Outdoors Installation Installation ItemsCheck GAS Type Installation Built-In Fireplace InstallationFireplace Clearances Fireplace pilot and burner must be at least 18 above floorMantel Clearances for Built-In Installation If you have not assembled firebox, follow instructions onRoute flexible gas line through access hole in hearth base Placing Hearth Base Against WallConnecting to GAS Supply Propane/LP Supply Tank External RegulatorConnecting Fireplace to Gas Supply Installation Items NeededPropane/LP NaturalChecking GAS Connections Test Pressures Equal To or Less Than Psig 3.5 kPaCorrect all leaks at once Optional Wireless hand-held Remote Control Accessories Pressure Testing Fireplace Gas ConnectionsInstalling Receiver Installing 9-Volt Battery in Hand-Held Remote Control UnitSee Figure As pictured in FigureMust not be lengthened Air conditioning ductsOptional Wall Switch GWMS2 Remote-Ready Models Only Installing LOG SET and ScreenFor Your Safety Read Before Lighting Operating FireplaceOperating Fireplace Lighting InstructionsManual Lighting Procedure To Turn OFF GAS To ApplianceRemote-ready Models Shutting Off FireplaceOptional Hand-Held Remote OperationManual Mode Auto Thermostatic ModeOn/Off Series Model HRC100 and HRC101 Thermostat Series Model HRC200 and HRC201Switch Optional Inspecting BurnersPilot Flame Pattern Burner Flame PatternCleaning Maintenance Burner Injector Holder Pilot Air Inlet HoleIf burner flame pattern is incorrect, as shown in Figure Blow air into the primary air holes on the injector holderTroubleshooting Observed Problem Possible Cause RemedyLOG Set CabinetTroubleshooting Delayed ignition of burner Noise when burner is litObserve minimum installa White powder residue forming When heated, vapors fromGas leak. See Warning Specifications Wiring DiagramReplacement Parts Service HintsIllustrated Parts Breakdown MANUAL-controlled models Cgmfn and CgmfpParts List 101629-02Illustrated Parts Breakdown REMOTE-READY Models Accessories WALL-MOUNT ON/OFF SwitchReceiver and HAND-HELD Remote Control KIT HRC100 and HRC101 Equipment Shutoff Valve GA5010119315-01A Not a UPC

VGMRN, VGMRP, CGMFN, CGMFP specifications

Desa CGMFP, VGMRN, VGMRP, and CGMFN represent a series of cutting-edge developments designed to optimize various aspects of modern technology and infrastructure. These entities focus on enhancing efficiency, sustainability, and overall performance within their respective domains.

Desa CGMFP, or the Comprehensive Green Manufacturing Facility Program, is dedicated to promoting sustainable manufacturing practices. Its primary features involve the integration of green technologies that minimize waste and energy consumption. The program emphasizes the use of renewable energy sources, such as solar and wind, to power manufacturing operations. This initiative not only reduces the carbon footprint of production processes but also helps organizations meet regulatory standards for environmental protection.

VGMRN, which stands for Variable Grid Management and Resource Network, is a sophisticated system designed to enhance the efficiency of energy distribution. It utilizes advanced algorithms and machine learning to manage energy loads dynamically across the grid. One of the standout characteristics of VGMRN is its ability to forecast energy demand patterns, allowing for proactive adjustments to energy supply. This results in minimized downtime and optimized usage of resources, making it an essential component of smart grid solutions.

VGMRP, or Variable Grid Management and Resource Planning, complements the work of VGMRN by focusing on the strategic planning of resource allocation within energy networks. Its core features include predictive analytics and scenario modeling, which empower utilities to simulate various energy distribution scenarios and make informed decisions. This technological approach not only aids in efficient resource use but also supports resilience against fluctuations in energy supply and demand.

Lastly, CGMFN, the Comprehensive Green Manufacturing Framework Network, provides a robust platform for collaboration across industries engaged in green manufacturing. This network facilitates the sharing of best practices, research advancements, and innovative solutions. Key characteristics of CGMFN include a strong emphasis on interdisciplinary cooperation and the promotion of circular economy principles, which encourage the utilization of recycled materials and waste reduction strategies.

Together, these initiatives encapsulate a forward-thinking approach to manufacturing and energy management. They leverage technology and strategic planning to enhance productivity while ensuring that environmental sustainability remains at the forefront of operations. As industries continue to evolve, Desa CGMFP, VGMRN, VGMRP, and CGMFN will play pivotal roles in shaping a greener, more efficient future.