Desa VGMRN Connecting Fireplace to Gas Supply, Propane/LP, Natural, Installation Items Needed

Page 14

INSTALLATION

Continued

We recommend that you install a sediment trap in supply line as shown in Figure 14. Locate sediment trap where it is within reach for cleaning. Install in piping system between fuel supply and heater. Locate sediment trap where trapped matter is not likely to freeze. A sediment trap traps moisture and contaminants. This keeps them from going into fireplace controls. If sediment trap is not installed or is installed wrong, fireplace may not run properly.

CSA Design-

 

Certified Equipment

 

Shutoff Valve With

 

1/8" NPT Tap*

Propane/LP

 

 

From External

 

Regulator (11"

 

W.C.** to 14"

 

W.C. Pressure)

Approved

Natural

Flexible Gas

From Gas Meter

Line

(5" W.C.** to

 

 

10.5" W.C.

3" Minimum

Pressure)

 

Pipe Nipple Cap Tee Joint

Sediment Trap

Figure 14 - Gas Connection

* Purchase the optional CSA design-certified

1.Route flexible gas line, included, from fire- place control to equipment shutoff valve through side or rear access holes in outer casing (see Figure 1, page 5).

2.Apply pipe joint sealant lightly to male threads of gas connector attached to flexible gas line/ equipment shutoff valve (see Figure 15).

CAUTION: Avoid damage to regulator. Hold gas regulator with wrench when connecting it to gas piping and/or fittings (Manual-Controlled Models Only).

CAUTION: Avoid damage to gas control. Hold gas control with wrench when connecting it to gas piping and/or fittings (Remote-Ready Models Only).

3.Check all gas connections for leaks. See

Checking Gas Connections.

4.Feed flexible gas line into fireplace base area while replacing branch support. Make sure the entire flexible gas line is in fireplace base area.

To Gas Regulator (Manual-Controlled Models) or Control

Valve (Remote-

Ready Models) Equipment

Shutoff Valve

equipment shutoff valve from your dealer. See

Accessories, page 34.

CONNECTING Fireplace to Gas Supply

Installation Items Needed

• Phillips screwdriver

• sealant (resistant to propane/LP gas, not

Flexible Gas Line from Fireplace Gas Regulator Provided

With Fireplace

Propane/LP

To External

Regulator

Natural

To Gas Supply

provided)

NOTICE: Most building codes do not permit concealed gas connections. A flexible gas line is provided to allow acces- sibility from the fireplace (see Figure 1, page 5). The flexible gas supply line connection to the equipment shutoff valve should be accessible.

Figure 15 - Attaching Flexible Gas Line

to Equipment Shutoff Valve

14

www.desatech.com

119315-01A

Image 14
Contents OWNER’S Operation and Installation Manual Shown with Optional Cabinet Mantel/Hearth Base AccessoryTable of Contents Safety Information Local Codes UnpackingAssembly Product FeaturesOptional Remote Control Accessories Product IdentificationAir for Combustion Ventilation Providing Adequate VentilationConfined and Unconfined Space AIR for Combustion VentilationDetermining FRESH-AIR Flow for Fireplace Location Determining if You Have a Confined or Unconfined SpaceVentilation Air From Outdoors Ventilation AIRVentilation Air From Inside Building Check GAS Type InstallationInstallation Items Fireplace Clearances InstallationBuilt-In Fireplace Installation Fireplace pilot and burner must be at least 18 above floorMantel Clearances for Built-In Installation If you have not assembled firebox, follow instructions onRoute flexible gas line through access hole in hearth base Placing Hearth Base Against WallConnecting to GAS Supply Propane/LP Supply Tank External RegulatorPropane/LP Connecting Fireplace to Gas SupplyInstallation Items Needed NaturalCorrect all leaks at once Checking GAS ConnectionsTest Pressures Equal To or Less Than Psig 3.5 kPa Installing Receiver Optional Wireless hand-held Remote Control AccessoriesPressure Testing Fireplace Gas Connections Installing 9-Volt Battery in Hand-Held Remote Control UnitMust not be lengthened See FigureAs pictured in Figure Air conditioning ductsFor Your Safety Read Before Lighting Optional Wall Switch GWMS2 Remote-Ready Models OnlyInstalling LOG SET and Screen Operating FireplaceOperating Fireplace Lighting InstructionsRemote-ready Models Manual Lighting ProcedureTo Turn OFF GAS To Appliance Shutting Off FireplaceOptional Hand-Held Remote OperationOn/Off Series Model HRC100 and HRC101 Manual ModeAuto Thermostatic Mode Thermostat Series Model HRC200 and HRC201Pilot Flame Pattern Switch OptionalInspecting Burners Burner Flame PatternIf burner flame pattern is incorrect, as shown in Figure Cleaning MaintenanceBurner Injector Holder Pilot Air Inlet Hole Blow air into the primary air holes on the injector holderLOG Set TroubleshootingObserved Problem Possible Cause Remedy CabinetTroubleshooting Observe minimum installa Delayed ignition of burnerNoise when burner is lit White powder residue forming When heated, vapors fromGas leak. See Warning Replacement Parts SpecificationsWiring Diagram Service HintsIllustrated Parts Breakdown MANUAL-controlled models Cgmfn and CgmfpParts List 101629-02Illustrated Parts Breakdown REMOTE-READY Models Receiver and HAND-HELD Remote Control KIT HRC100 and HRC101 AccessoriesWALL-MOUNT ON/OFF Switch Equipment Shutoff Valve GA5010119315-01A Not a UPC

VGMRN, VGMRP, CGMFN, CGMFP specifications

Desa CGMFP, VGMRN, VGMRP, and CGMFN represent a series of cutting-edge developments designed to optimize various aspects of modern technology and infrastructure. These entities focus on enhancing efficiency, sustainability, and overall performance within their respective domains.

Desa CGMFP, or the Comprehensive Green Manufacturing Facility Program, is dedicated to promoting sustainable manufacturing practices. Its primary features involve the integration of green technologies that minimize waste and energy consumption. The program emphasizes the use of renewable energy sources, such as solar and wind, to power manufacturing operations. This initiative not only reduces the carbon footprint of production processes but also helps organizations meet regulatory standards for environmental protection.

VGMRN, which stands for Variable Grid Management and Resource Network, is a sophisticated system designed to enhance the efficiency of energy distribution. It utilizes advanced algorithms and machine learning to manage energy loads dynamically across the grid. One of the standout characteristics of VGMRN is its ability to forecast energy demand patterns, allowing for proactive adjustments to energy supply. This results in minimized downtime and optimized usage of resources, making it an essential component of smart grid solutions.

VGMRP, or Variable Grid Management and Resource Planning, complements the work of VGMRN by focusing on the strategic planning of resource allocation within energy networks. Its core features include predictive analytics and scenario modeling, which empower utilities to simulate various energy distribution scenarios and make informed decisions. This technological approach not only aids in efficient resource use but also supports resilience against fluctuations in energy supply and demand.

Lastly, CGMFN, the Comprehensive Green Manufacturing Framework Network, provides a robust platform for collaboration across industries engaged in green manufacturing. This network facilitates the sharing of best practices, research advancements, and innovative solutions. Key characteristics of CGMFN include a strong emphasis on interdisciplinary cooperation and the promotion of circular economy principles, which encourage the utilization of recycled materials and waste reduction strategies.

Together, these initiatives encapsulate a forward-thinking approach to manufacturing and energy management. They leverage technology and strategic planning to enhance productivity while ensuring that environmental sustainability remains at the forefront of operations. As industries continue to evolve, Desa CGMFP, VGMRN, VGMRP, and CGMFN will play pivotal roles in shaping a greener, more efficient future.