Desa DVFE34 PRE-INSTALLATION General Venting Preparation, Location of Vent, Termination

Page 5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OWNER’S MANUAL

 

PRE-INSTALLATION

 

 

 

 

 

 

 

 

 

GENERAL VENTING

PREPARATION

 

 

 

 

 

 

 

 

 

 

These models are approved for use with

Continued

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FMI 7" direct-vent pipe components and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

terminations.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Your fireplace is approved to be vented either

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

through the side wall, or vertically using the

13"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

following guidelines:

 

 

 

 

 

 

9 1/4"

 

41"

 

 

 

 

 

• Only use FMI venting components or kits

29"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

specifically approved for this fireplace.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Minimum clearance between vent pipes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

and combustible materials is 1" (25 mm),

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

except where stated otherwise.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Combustible material may be flush with

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the top front of fireplace with a maxi-

 

12 5/8"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mum thickness of 3/4".

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Do not recess venting terminals into a

 

 

 

 

34 3/8"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

wall or siding.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

35 1/16"

 

 

 

 

 

 

 

 

Nailing Tabs

• If exterior wall is vinyl, you must use a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

vinyl siding standoff.

 

 

58"

 

 

 

 

 

 

 

 

 

 

• Install horizontal venting with a 1/4" rise

 

 

 

 

 

 

 

 

 

 

 

 

for every 12" of run toward the termination.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 6 - Framing Clearances for Corner Installation

 

 

 

 

 

 

 

 

• You may paint the vent terminal with

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

450ºF (232ºC) heat-resistant paint to co-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ordinate with the exterior finish.

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

• There must not be any obstruction such

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

as bushes, garden sheds, fences, decks,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

or utility buildings within 24" from the

Note: It is recom-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

front of the termination cap.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mended there be a

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

• Do not locate termination cap where exces-

minimum clearance

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wall

 

sive snow or ice build up may occur. Be sure

of 18" above top of

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to clear vent termination area after snow falls

louver opening when

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to prevent accidental blockage of venting

installing a television

 

 

 

 

B

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

system. When using snow blowers, do not

or entertainment

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

center above the

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

direct snow towards vent termination area.

fireplace.

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

G

 

 

 

 

 

 

 

 

LOCATION OF VENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINATION

 

 

 

Top of Louver Opening

Ref.

Mantel Depth

Ref.

Mantel from Top

 

 

 

 

of Louver Opening

 

 

 

 

 

 

1

14" (356mm)

A

16" (406mm)

 

 

 

 

 

 

2

12" (305mm)

B

14" (356mm)

 

3

10" (254mm)

C

12" (305mm)

 

 

 

 

 

 

4

8" (203mm)

D

10" (254mm)

 

 

 

 

 

 

5

6" (152mm)

E

8" (203mm)

 

 

 

 

 

 

6

4" (101mm)

F

6" (152mm)

 

 

 

 

 

 

7

2" (51mm)

G

4" (101mm)

 

 

 

 

 

 

When locating vent termination, it is impor- tant to observe the minimum clearances shown in Figure 8, page 6. You will avoid extra framing by positioning your fireplace against an already existing framing mem- ber. The sides of the fireplace may be posi- tioned directly against combustible walls.

*Check with local codes or with the current CAN/CGA B149 [.1 or .2] Installation Codes for Canada or the USA Installations follow the current National Fuel Gas Code, ANS Z223.1, also known as NFPA 54.

Figure 7 - Clearances for Combustible Mantels

Continued

107205

5

For more information, visit www.desatech.com

Image 5
Contents DVFE34 Natural Electronic Ignition For Your SafetyFor Your Safety What to do if YOU Smell GAS DIRECT-VENT Fireplace Safety InformationLocal Codes Product IdentificationGlossary Terms OperationLocation and Space Requirements PRE-INSTALLATION PreparationClearances Framing and FinishingTermination PRE-INSTALLATION General Venting PreparationLocation of Vent General Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a ChaseSnorkel Termination Installation for Horizontal TerminationFor vinyl siding use vinyl siding stand Rigid Vent Pipe Horizontal Venting Rigid Vent Pipe Horizontal Termination ConfigurationsVenting with Two 90 Elbows Cathedral Ceiling Installation Installation for Vertical TerminationFlat Ceiling Installation Venting with Two 90 Elbow s Vertical Termination ConfigurationsVertical Venting FMI Rigid Venting High Altitude InstallationParts Lists for Venting Kits and Components Installing Optional Blower Accessory Fireplace InstallationInstalling GA3700/DA3610TA Blowers Check GAS TypeIf your fireplace system is installed Installation Items Needed Installing GAS Piping to Fireplace LocationChecking GAS Connections Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Close equipment shutoff valve see Fig- ure Pressure Testing Fireplace Gas ConnectionsREMOVING/REPLACING Glass Door Installing Optional Wall Mount Switch GWMS2Attaching Magnetic Decorative Brass Strips Installing Optional Brick Liner D8037AInstalling Log No Installing LOGS, Lava Rock and Glowing EmbersOperating Fireplace For Your Safety Read Before LightingLighting Instructions To Turn OFF GAS To ApplianceOperating Optional GWMS2 Wall Mounted Switch Operating Optional Blower AccessoryPilot Assembly Inspecting BurnersGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause Remedy TroubleshootingOrifice Gas leak. See Warning statement Service Hints Replacement PartsTechnical Service Wiring DiagramsDVFE34 SpecificationsDVFE34 Illustrated Parts BreakdownKEY Part Number Description QTY Parts ListAccessories 107205 Warranty Information

DVFE34 specifications

Desa DVFE34 is a cutting-edge development designed to meet the demanding needs of modern urban living. This residential complex stands out due to its innovative architecture, sustainable technologies, and its commitment to enhancing the quality of life for its residents.

One of the main features of Desa DVFE34 is its environmentally friendly design. The complex has been constructed with sustainable materials that minimize its carbon footprint. Solar panels are integrated into the building's structure, providing renewable energy for common areas and reducing reliance on non-renewable power sources. The implementation of rainwater harvesting systems ensures efficient use of water resources, promoting sustainability within the community.

In terms of technology, Desa DVFE34 is equipped with smart home capabilities. Residents can control various aspects of their homes—from lighting to heating—through a centralized app on their smartphones. This not only adds convenience but also allows for energy savings and enhances security. The incorporation of security systems with smart alarms and surveillance cameras ensures a safe living environment.

The layout of the building is thoughtfully designed to maximize space and comfort. Spacious apartments come with modern finishes, high ceilings, and large windows that allow plenty of natural light to flow in. Common areas include beautifully landscaped gardens, recreational spaces, and fitness facilities that encourage a healthy lifestyle. Additionally, designated areas for social gatherings foster a sense of community among residents.

Accessibility is a key characteristic of Desa DVFE34. Located in a prime urban area, residents have easy access to public transport, shopping centers, and essential services. This not only facilitates daily commutes but also enhances the overall living experience by placing residents in the heart of the city’s amenities.

In summary, Desa DVFE34 represents a harmonious blend of modern living and sustainable practices. Its innovative features, from smart technologies to eco-friendly designs, set a new standard for urban residential developments. By prioritizing both comfort and sustainability, Desa DVFE34 is an exemplary model of what future living spaces can and should be.