Empire Comfort Systems PV-28SV50-B(N,P)-1 Vertical Examples for Colinear Direct Vent

Page 25

VERTICAL EXAMPLES FOR COLINEAR DIRECT VENT

Special Note: The vent terminal (PTrap, Vent cap or two 90° elbows) and first 90° elbow off back of the heater, when within 6” (15.2 cm) off back of the heater, do not contribute to the overall vent length measurement. For each 45° elbow installed in the horizontal run, the length of the horizontal run MUST be reduced by 1.5 feet (45 cm). This does not apply if the 45° elbows are installed on the vertical part of the vent system. Reduce the length of the horizontal run 3 feet (91.4 cm) for every 90° elbow.

Note: Exhaust must be a minimum of 3” above air intake inlet.

Figure 28

Calculation example of vent run maximum 40’

Determining Minimum Vent Height Above the Roof

WARNING: Major U.S. building codes specify minimum chimney and/or vent height above the rooftop. These minimum heights are necessary in the interest of safety.

24820-1-0409

Page 25

Image 25
Contents Empire Table of Contents This is a Heating Appliance Important Safety InformationLP-GAS Warning Odor Safety Information for Users of LP-GASVent Directly BELOW. Keep Clear of ALL Obstructions Requirements for MassachusettsPressure Testing of the Gas Supply System Installing a New Main Gas CockGAS Supply Recommended Gas Pipe DiameterIntroduction Installation Instructions General Safety Information SpecificationsInstallation on Rugs and Tile Heater Installation for Direct VentClearances for Direct Vent Locating Wall OpeningClearances for Single Flue Heater Installation for Single FlueHeater with Pedestal and Single Flue Adaptor Heater without pedestal SpecificationsFireplace Insert with Mantel Surround with Slim Top Panel Fireplace Insert with Mantel Surround with Short Top Panel Freestanding Units Clearance to CombustiblesInsert Into Masonry Fireplace Rough Framing DimensionsWall Clearances Log Installation All Logs LOG SET Installation InstructionsVent Examples for Single Flue Single Flue Venting with Shroud Installed Venting for Existing Fireplace InstallationSingle Flue Vertical Vent Run Shroud Kit Model# Pvsh Roof Determining Minimum Vent Height AboveSingle Flue Vertical Vent Run With 45 degree elbows Available from Empire Comfort Systems, Inc PVVK-CFA Flex Vent KITDetermining Minimum Vent Height Above the Roof PVVK-SH Horizontal Vent Adaptor KIT Horizontal Examples for Colinear Direct Vent Vertical Examples for Colinear Direct Vent Colinear Direct Vent Pitched Roof Installation Colinear adaptor Pvca Horizontal Colinear Direct Vent AdaptorTermination Cap Pvvtc Termination CAP Vent KITFlat Roof or Chimney Application Pvct Colinear Transition Vent KITHorizontal Application Horizontal Venting Direct Vent Installation InstructionsDirect Vent System Building Exterior View Minimum Exterior Grade Dimension Unit With Pedestal Minimum Exterior Grade Dimension Unit Without PedestalStep PVVK-24H and PVVK-48H Vent KITPVVK-24H and PVVK-48H Vent KIT GAS Connection Line Supply GAS Connection Installation InstructionsOperating Instructions Checklist Lighting Instructions For Your Safety Read Before Lighting FAN Operation Conversion Instructions from LP Propane GAS to Natural GAS GAS Conversion InstructionsConversion Instructions from Natural GAS to LP Propane GAS Automatic Humidifier Operation Optional Controllers Installation Instruction for TMV2 Two Stage Thermostat ModelEconomy Display Mode Wiring Diagram WiringOver Temperature Cut Out MaintenanceGeneral Information Paint Curing First FiringGlass Assembly Replacement Front door removal drawing Glass CleaningMain Burner Drawing Cleaning Main Burner General Glass InformationResetting the Heater Unit Operating FaultsLOG Placement Main Convection FAN Surround Installation InstructionsHeat Exchanger Optional Pedestal Assembly Installation Pedestal Installation InstructionsIndex Part Number Description Parts ListGAS Line Rear Parts View Parts View Purchase Date Dealer Name/Phone Warranty TermsParts Not Under Warranty HOW to Order Repair PartsWarranty Parts Master Parts Distributor ListComfort Systems