Weil-McLain EGH-125, EGH-105 manual Viii Check-out procedure leak test, Leak test procedure

Page 25

CSD-1 control system — Natural gas

VIII Check-out procedure — leak test

For your safety, turn off electrical power supply before making any electrical connections to avoid possible shock hazard.

1.Turn off power to the boiler and remove the (RED) wire from terminal TH of the main gas valve (Figure 12, item 1). Tape off terminal end of removed wire and restore power to the boiler.

2.Close manual gas valve (Figure 12, item 2).

3.Check that both leak test valves (Figure 12, items 3 and 4) are closed. Then remove plugs and insert 1/8" NPT hose barb fittings as shown in Figure 12.

4.Attach a U-tube manometer to first leak test valve (Figure 12, item 3).

5.Open first leak test valve (Figure 12, item 3) and check for pressure. See NOTICE at right.

6.Close first leak test valve (Figure 12, item 3) and remove manometer.

7.Attach manometer to second leak test valve (Figure 12, item 4 ).

8.Apply call for heat to boiler and check that electronic pilot proves.

9.Open second leak test valve (Figure 12, item 4) and check for pressure. See NOTICE below.

10.Close second leak test valve and remove manometer.

11.Remove call for heat to boiler. Turn off power to the boiler.

12.Remove hose barbs from leak test valves and replace plugs.

13.Replace (RED) wire to terminal TH of gas valve.

14.Open manual gas valve (Figure 12, item 2) and restore power to boiler.

When checking for pressure at the leak test valves, it is normal to find a small pressure reading. If the pressure continues to rise after opening the leak test valve, the main valve seat is leaking and should be replaced.

4

3

Figure 12

Leak test procedure

 

2

 

1

 

677-11

Part Number 550-110-677/0299

25

Image 25
Contents Control Supplement Please read this page first Boiler cartons Carton guideGas train assembly InstallationVent damper assemblies Install optional vent damper if suppliedII Piping connections III Install boiler controls water boilersWater boiler connections IV Optional heaters steam boilers only III Install boiler controls steam boilersSteam boiler connections Gas piping VI WiringCall for heat VI Wiring sequence of operationWater boiler wiring Wiring water boilersSchematic Wiring Diagram Control assembly water boiler VI Wiring water boilersCSD-1 control panel Gravity return VI Wiring steamSchematic Wiring Diagram 13a Control assembly steam, gravity returnCSD-1 control panel Pumped return Schematic Wiring Diagram Control assembly steam, pumped return Terminal strip Before proceeding To place boiler in operation VII Final adjustmentsOperating instructions VII Final adjustments operating instructionsViii Check-out procedure operation Leak test procedure Viii Check-out procedure leak testVerify proper operation after servicing Viii Check-out procedure troubleshootingReplace pilot assembly TS-2 No Spark System boiler with vent damper does not work Not OK TS-3 Pilot lights Main valve will not come on from previous IX Service and maintenance Water boiler assembly Replacement parts water boilersRV20VL Water boiler replacement partsSteam boiler assembly Replacement parts steam boilersRV20VL Steam boiler replacement partsWeil-McLain Blaine Street Michigan City,