Weil-McLain EGH-125, EGH-105 manual Water boiler replacement parts, RV20VL

Page 33

CSD-1 control system — Natural gas

Table 5 Water boiler replacement parts

Before replacing any parts on the boiler — Turn off power to boiler and shut off gas supply.

Failure to comply could result in severe personal injury, death or substantial property damage.

Item

Part description

Boiler models

Vendor

Vendor part number

Weil-McLain

 

 

 

 

 

part number

1

Main burner

EGH-105 – 125

Weil-McLain

— See EGH Manual —

2

Main burner with pilot bracket

EGH-105 – 125

Weil-McLain

— See EGH Manual —

3

Pilot burner bracket (not shown)

EGH-105 – 125

Weil-McLain

— See EGH Manual —

4

Pilot burner (not shown)

EGH-105 – 125

Beckett Gas

E48A-1

511-330-166

Johnson Controls

Q90GE-1

 

 

 

 

5

Main gas valve

EGH-105 – 125

Robertshaw

7000DERHC-S7C

511-044-287

6

Manual gas valve, 1" NPT

EGH-105 – 125

Watts

FBV3-06

511-246-290

7

Leak test valve

EGH-105 – 125

Key Gas

 

511-246-339

8

Pilot gas valve

EGH-105 – 125

Honeywell

V8046C-1014

511-044-039

Johnson Controls

H91ABG

 

 

 

 

8a

Pilot gas pressure regulator

EGH-105 – 125

Maxitrol

RV20VL

510-933-195

9

Pilot shutoff valve

EGH-105 – 125

Conbraco

53-300-01

511-246-345

10

Pilot tubing, alum. 1/8" O.D. x 34" long

EGH-105 – 125

Available at local supply house

 

11

Ignition control

EGH-105 – 125

United Technologies

1003-615

511-330-086

12

Impulse relay

EGH-105 – 125

Potter-Brumfield

S89R-11ABD1-24

510-350-226

13

Push-button switch

EGH-105 – 125

Honeywell

AML21CBA2AA

511-624-580

Eaton Controls

221K11810

 

 

 

 

14

Lens cover

EGH-105 – 125

Honeywell

AML51-C10R

511-624-581

Eaton Controls

220PM02A

 

 

 

 

15

Light bulb

EGH-105 – 125

TI-¾ (available at local supply house)

 

16

Wiring harness, water boilers

EGH-105 – 125

Weil-McLain

 

591-391-886

 

 

EGH-105

Effikal

RVGP-KS-10BF

381-800-446

17

Vent damper assembly — optional

Johnson Controls

Q35GP-2 (note 1)

 

 

(not for use in Canada)

EGH-115 – 125

Effikal

RVGP-KS-12BF

381-800-447

 

 

 

 

 

 

 

 

 

 

 

Johnson Controls

Q35GR-2 (note 1)

 

 

 

 

18

Vent damper actuator

EGH-105 – 125

Effikal only

RVGP

510-512-337

Johnson only

M35BE-1C

510-312-255

 

 

 

 

 

 

 

 

 

19

Vent damper harness

EGH-105 – 125

Weil-McLain

10C321

591-391-795

20

Limit control, automatic reset

EGH-105 – 125

Honeywell

L4080B-1311

510-312-209

White-Rodgers

11B83-16

 

 

 

 

 

 

 

 

 

 

21

Limit control, manual reset

EGH-105 – 125

Honeywell

L4006E-1000

510-312-041

22

Probe LWCO, manual reset

EGH-105 – 125

McDonnell & Miller

PS852M-24

511-114-530

23

Pressure/temperature gauge

EGH-105 – 125

Ametek

19998

510-218-097

 

 

 

 

ENFM-USA

4104-2-1/2-1/4CBM

 

 

 

 

24

Transformer/relay

EGH-105 – 125

Honeywell

R8285D-5001

510-312-169

 

 

 

 

 

 

Note 1 — Johnson damper assembly consists of M35BC actuator and Y15 vent pipe.

 

 

Replacement parts must be purchased through a local Weil-McLain distributor. When ordering, specify boiler model and series and

include description and number of replacement part. Results from using modified or other manufactured parts will not be covered

by warranty and may damage boiler or impair operation.

 

 

 

 

Refer to boiler manual for parts not listed above.

 

 

 

 

 

 

 

 

Part Number 550-110-677/0299

 

 

 

33

Image 33
Contents Control Supplement Please read this page first Boiler cartons Carton guideGas train assembly InstallationVent damper assemblies Install optional vent damper if suppliedIII Install boiler controls water boilers II Piping connectionsWater boiler connections III Install boiler controls steam boilers IV Optional heaters steam boilers onlySteam boiler connections Gas piping VI WiringCall for heat VI Wiring sequence of operationWater boiler wiring Wiring water boilersSchematic Wiring Diagram Control assembly water boiler VI Wiring water boilersCSD-1 control panel Gravity return VI Wiring steamSchematic Wiring Diagram 13a Control assembly steam, gravity returnCSD-1 control panel Pumped return Schematic Wiring Diagram Control assembly steam, pumped return Terminal strip Before proceeding To place boiler in operation VII Final adjustmentsOperating instructions VII Final adjustments operating instructionsViii Check-out procedure operation Leak test procedure Viii Check-out procedure leak testVerify proper operation after servicing Viii Check-out procedure troubleshootingReplace pilot assembly TS-2 No Spark System boiler with vent damper does not work Not OK TS-3 Pilot lights Main valve will not come on from previous IX Service and maintenance Water boiler assembly Replacement parts water boilersRV20VL Water boiler replacement partsSteam boiler assembly Replacement parts steam boilersRV20VL Steam boiler replacement partsWeil-McLain Blaine Street Michigan City,