Smith Cast Iron Boilers GVIOM-5R manual Boiler SET-UP, Boiler Operation, Direct Ignition Systems

Page 18

Page 18

GV100W BOILER

INSTALLATION & OPERATING INSTRUCTIONS

BOILER SET-UP

Note: Before starting the boiler, turn off the electrical supply going to it. Make sure that gas is available at the gas valve inlet. Open the valves in the return and supply piping. Failure to take these precautions will prevent the boiler from operation properly.

Fill the boiler and all of the radiation with water. Make sure that the system is completely purged of air.

Review these instructions and make sure that the boiler installation complies with all of the instructions up to this point.

Direct Ignition Systems

A.Connect a manometer having a minimum capacity of 10 in, 254 mm, WC to the outlet pressure port of the gas valve. Make sure that the gas supply piping has been purged of air and that all gas joints up to the gas valve have been thoroughly checked for leaks. Wait at least five minutes for the gas to dissipate before turning on the electrical power.

B.Understand and follow the operating instructions, on pg. 14 of this manual, that are applicable to the type of ignition system installed on the boiler.

C.Raise the thermostat at least 5 degrees above the room temperature.

BOILER OPERATION

WARNING: Before operating read and understand the instructions contained in this manual. Do not attempt to operate this boiler if it has not been installed in accordance with the guidelines set forth in this manual. Read and fully understand the operating instructions in the “For Your Safety Read Before Operating” section of this manual, pg 14. Failure to comply with this warning could result in a fire or explosion!

Should overheating occur or the gas supply fail to shut off, do not turn off or disconnect the electrical supply to the pump. Instead, shut off the gas supply at a location external to the appliance.

En cas de surchauffe ou si l’alimentation de gaz ne peut être coupée, ne pas couper ni débrancher l’alimentation électrique de la ponpe. Fermer plutôt le robinet d’admission de gaz à l’extérieur de l’appareil..

Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control that has been under water.

N’utilisez pas cet appareil s’il a été plongé dans l’eau, même partiellement. Faites inspecter l’appareil par un tecnicien qualifié et remplacez toute partie du système de contrôle et toute commande qui ont été plongés dans l’eau.

A delay of about 30 seconds will take place as the silicon carbide ignitor heats up. Once the ignitor is hot, the main gas valve will open and the burners should light. If the burners fail to light the system will make two more ignition attempts. If the burners light, but go out within 4 seconds, the system will make three ignition attempts. If the burners have not lit after the last ignition try, the gas valve will close and the system will go into lock out. Do not attempt to reset the system until the ignition system has been inspected and the problem resolved. Once the problem has been resolved and 5 minutes have passed since the last ignition attempt, reset the system by turning the thermostat to it’s lowest setting and then back to where it was or by momentarily interrupting the electrical power to the boiler.

D.With the burners in operation, close the manual shutoff valve in the gas supply line. As soon as the burner flames go out, open the manual shutoff valve. A normal ignition sequence should take place.

E.With the burners in operation, interrupt the power to the control circuit by lowering and raising the thermostat. A normal ignition sequence should follow.

F.To test the ignition safety shutoff device, close the manual shutoff valve in the gas supply line. Within 6 seconds of main burner flame extinction, the main gas valve solenoid should close with an audible noise.

The ignitor should glow and an attempt at ignition take place. After unsuccessfully attempting to light the main burners the ignition module should lock out.

Open the manual shutoff valve in the gas supply line. Reset the ignition control system by interrupting, then restoring electrical power to the boiler. A normal ignition sequence should take place.

Image 18
Contents GV100W GV100W Boiler Installation & Operating Instructions Boiler Ratings & Capacities Boiler LocationCombustible Floor Option Boiler Dimensions Common Vent Systems Fresh Air ⁄4 Wire Metal Wooden Duct SizeCombustion AIR Combustion Air Duct SizingChimney Venting Chimney Inspection & SizingVertical Venting Horizontal Venting Heating System PipingNo B System Bypass Pump Away BypassPumped Blend Piping For Use With Cooling UnitsReverse Acting Aquastats GAS Supply Piping CirculatorsEquivalent Pipe Length Chart Electrical WiringThermostat Installation CO DetectorsFIG. no Fenwal/Honeywell Hot Surface Ignition FIG. no Multi-Zone Diagram To Turn OFF GAS to Appliance For Your Safety Read Before OperatingOperating Instructions Property damage, personal injury or loss of lifePour Votre Sécurité Lisez Avant DE Mettre EN Marche Boiler SET-UP Boiler OperationDirect Ignition Systems Checking & Adjustment Heat Exchanger Cleaning Boiler MaintenanceBurner Installation Burner RemovalInstructions to the Installer GV100 Series Repair Parts Name of PartRef # Name of Part HSI Fenwall Ignition SystemNorth ELM Street WESTFIELD, MA 01085 TEL 562-9631 FAX 413

GVIOM-5R specifications

The Smith Cast Iron Boilers GVIOM-5R is a high-efficiency, versatile heating solution designed for both residential and commercial applications. This model is particularly renowned for its robust construction, impressive performance, and energy-saving features. With a focus on durability, the GVIOM-5R is built from high-quality cast iron, which not only ensures longevity but also excellent thermal mass for effective heat retention.

One of the main features of the GVIOM-5R is its fire-tube design, which enhances heat transfer and allows for higher efficiency rates compared to traditional boiler designs. The fire-tube configuration ensures that flue gases travel through a series of tubes submerged in water, maximizing heat exchange and minimizing heat loss. This design contributes to an efficiency rating that often exceeds 85%, helping users to reduce their energy costs while maintaining comfort.

The boiler is equipped with advanced control technology, allowing for precise temperature management. This feature is critical for optimizing performance and ensuring consistent heating throughout the property. Additionally, an integrated diagnostic system enables users to monitor boiler operations and troubleshoot potential issues before they escalate, ensuring reliable performance and reducing downtime.

Another characteristic that sets the GVIOM-5R apart is its flexibility in fuel options. The boiler can operate on various fuels, including natural gas, propane, or oil, making it an adaptable choice for different heating needs. This multi-fuel capability not only provides versatility but also allows property owners to choose the most economical and efficient fuel source based on their specific circumstances.

Maintenance is also simplified with the GVIOM-5R, thanks to its accessible design that allows for easy servicing and parts replacement. The robust construction minimizes the need for frequent repairs, which enhances overall reliability and customer satisfaction.

In summary, the Smith Cast Iron Boilers GVIOM-5R combines durability, efficiency, and versatility. Its innovative fire-tube design, advanced control systems, multi-fuel capabilities, and ease of maintenance make it an outstanding choice for those seeking a reliable heating solution. Whether for a home or a commercial building, the GVIOM-5R stands out as a top-tier option that delivers consistent performance and long-term value.