Woodstock W1823 manual Setup

Page 17

Model W1823 (Mfg. Since 9/10)

 

 

6. Using the square port in the blower housing (see

 

 

Figure 12) for access, fasten the magnetic switch

 

 

bracket on the studs with (2) 516" flat washers and

 

 

(2) 516"-18 hex nuts.

 

 

7. With the help of another person, lift and position the

 

Magnetic

dust collector upright, then lock the casters so the

 

Switch

unit will not move during the rest of the assembly

Mounting

Bracket

process.

Bolts

 

 

Figure 12. Magnetic switch installation.

8.Have another person hold the cyclone funnel in- place against the intake barrel, and align the datum point labels, as shown in Figure 13, then clamp the cyclone funnel and the intake barrel together using the barrel clamp. To ensure a tight seal, make sure the clamp is tight when it overlaps, as shown in

Figure 13.

9.Connect the outlet port and its larger gasket to the filter canister with (6) 516"-18 x 34" button head cap screws. Do not overtighten the screws, or the outlet port flanges will bend and cause the gaskets to leak.

10.Have another person hold the canister filter in place while you fasten the outlet port and its smaller gasket to the blower housing with (8) 516"-18 x 12" button head cap screws, as shown in Figure 14.

11.Reach inside the canister filter and rotate the cleaning flap so the flat on the filter cleaning rod faces outward.

12.Place the cleaning handle onto the shaft, align the flat and set screw, then tighten the set screw (see

Figure 14).

-15-

Overlap

 

Intake Barrel

SETUP

 

Alignment

 

Cyclone

 

Funnel

 

Figure 13. Cyclone funnel installation.

Outlet Port

Set

Screw

Figure 14. Filter canister installation.

Image 17
Contents OWNERS MANUAL Page Contents Machine Description IntroductionWoodstock Technical Support Left side view Controls and FeaturesB68=C HE886IDCH `gg`e`d\ej`fej Xikfe ZXlj\XdX\kfk\dXZ`e\ip% SAFETYJ8=KPSafety Additional Safety for Dust Collectors Electrical Circuit Requirements for 110V PrewiredCircuit Requirements Full-Load Current RatingFor 220V Connection Must be Rewired For 110V Connection PrewiredGrounding Requirements Extension CordsInventory SetupUnpacking Canister Inventory Figure Qty Hardware and Tool Bag Inventory Figure QtyMachine Placement To assemble the dust collector, do these steps AssemblySetup Vacuum tube installed Screw Collection lid installation Canister bag installed To test run the machine, do these steps Test RunTips for Optimum Performance System SetupCollection System Metal Duct Duct MaterialPlastic Duct Flexible DuctFlex-hose grounded to Machine Plastic Blast System GroundingGeneral Operation OperationsRemote control receiver Hour Intervals Back Remote Control OperationBlack ABS Plastic Blast Gates Aluminum Blast Gates Cyclone Dust Collector AccessoriesNormal Filter Cleaning MaintenanceGeneral Emptying DrumMajor Filter Cleaning ServiceTo reprogram the remote control, do these steps Remote Control Reprogramming HL8C@=@CKI@@8E% Due to Electrical Safety InstructionsCKI@8CIHL@IDEKJ% You Must @I&FDGFEEK8D8% DamagedStop Wiring DiagramTo convert the Model W1823 to 220V, do these steps 220V ConversionMagnetic switch box Problem Possible Cause TroubleshootingOpen 1 or 2 more blast gates to different branch Parts Description Main Parts ListLabel Placement Model W1823 Mfg. Since 9/10 Place Stamp Here Warranty =\FjVainBVXcZhVcYIddah