6
Installation Assembly/
LP Gas
Tank Requirements
For
Maximum line pressure for
The Power Burner must be used with the gas pressure regulator. The regulator will control and maintain a uniform gas pressure in the mani- fold. The burner orifices have been sized for the gas pressure delivered by the regulator.
WARNING: Attempting to operate the Power Burner without the gas regulator installed could cause an explosion and possible death.
Cylinder Specification
Any LP gas supply cylinder used with the Power Burner must be:
•Constructed and marked in accordance with the Specifications for
•Approximately 12 inches in diameter and 18 inches high.
Power Burner
www.calflamebbq.com | LTR50001100, Rev. A |