14. Commissioning:

After installation of oil/gas-fired boiler, operation and performance tests shall be conducted to make certain that the burner is operating in an acceptable manner and that all safety controls and devices function properly. It is critical that the high limit, low water

cutoff and burner "cad cell" relay be checked for normal operation before leaving the job. Refer to the back page of this manual to write down the System Checkout information.

15. Maintenance:

Check for fouling or soot buildup in the combustion chamber at least every twelve (12) months.

Caution: Black carbon soot in the combustion chamber can, under certain conditions, be ignited by a spark or open flame. To prevent this unlikely occurrence, dampen the soot deposits with a wet brush or a fine water spray before servicing or cleaning the combustion chamber. Fouling or carbon soot buildup on the surfaces in the combustion chamber is caused by incomplete combustion, and is a sign of combustion air and/or venting problems. As soon as any fouling is observed, the cause of the fouling should be corrected and the combustion chamber should be cleaned as follows: Disconnect the electrical power supply to the boiler, burner and controls. Close Fire-O-Matic thermal shutoff valve at burner prior to servicing. Remove the front jacket panel (#9) and the loosen the two

(2)front boiler door nuts. Swing the boiler door open. Be careful not to damage the door stud threads or the flexible oil line. Brush and vacuum combustion chamber and flue passages until all deposits are removed. Reassemble components in reverse order, making sure any damaged gaskets are repaired or replaced.

Other maintenance requirements are as follows: Inspect wiring and controls for damage. Insure controls are operating correctly. Inspect oil or gas supply lines for damage, corrosion or leaks. Repair any leaks immediately. Inspect, clean or replace oil filter as specified by manufacturer. Inspect vent and fill pipes for any obstruction, damage or corrosion. Clean or replace as necessary. Lubricate the burner motor if necessary during service. Finally, consult burner manual for specific burner maintenance instructions.

Image 24
Contents Linear Boiler Page Table of Contents Important Information Please read this page carefullyBiasi B/40 Weight General InformationConforming to Codes and Regulations Combustion Air Supply Boiler LocationBoiler Block Assembly Installation of Boiler Trim ComponentsBiasi B/40 Burner Setup Burner ManufacturerFt 3/hr = 3600/sec. Per rev.*Size of gas meter Installation of Sediment Trapand Burner Supply Gas Line PipingInstallation of Sediment Trapand Burner Supply Breeching and Venting Blocked Flue Switch PipingBiasi B/40 Boiler Jacket Assembly Boiler Components Parts Vega B40 SeriesWiring Control Panel Description Relay Circulator Circulator Relay Control Panel Wiring Diagram for Riello Oil Burner Control Panel Wiring Diagram for Heat Wise Gas Burners Maintenance CommissioningInstaller Notes System CheckoutBiasi B/40 Biasi B/40 Warranty For Biasi B40 Series Commercial Cast-Iron Water Boilers