PAGE 8 | BIASI B/40 |
|
|
6. Boiler Block Assembly:
All Linear series boilers are shipped either as an assembled boiler block or a
To assemble split blocks, move the sections into a line facing each other. Sections may be slid along boards placed underneath the sections. Inspect nipple ports for damage or burrs. Remove any burrs by brushing the port very lightly. Wipe the push nipples and nipple ports with a clean cloth.
Apply a film of nipple compound to both the nipple and port. Install the nipple in the port and then seal it by hitting it with a rubber mallet. Apply section sealant to one section only and slide sections together. If the boiler came in sections, you will want to draw the sections together 2 or three at a time to insure that the blocks are coming together properly. Install the four draw rods and draw the sections together evenly (measure with yardstick). The longer draw rods should be installed on the top of the boiler. The shorter draw rods are installed on the bottom of the boiler. The bottom draw rods should not extend past the front section. Draw the sections together until sections make
DO NOT OVER TIGHTEN DRAW RODS
7. Installation of Boiler Trim Components:
The BIASI
1— Honeywell L4006 E Aquastat | 1— Pressure/Temperature Gauge | |
1— 3/4” X 3” Nipple | 1— 3/4” Boiler Drain | |
1— 3/4” Elbow | 1— 1/4”X3/4” Bushing | |
1— 50 PSI Pressure Relief Valve | 1— 2 | 1/2” MPT Supply Manifold |
1— Immersion Well | 1— 2 | 1/2” MPT Return Manifold |
1— Four Wire Molex Wire Harness |
|
|
|
|
|
The above mechanical components should be installed following the diagram of the boiler tappings on the following page. The installation of the above wiring components (wiring harness) will be described in the wiring portion of this installation manual.