Harman VF3000 manual Verti-Flow Stoker Control, Verti-FlowStoker Control

Page 17

Verti-Flow™ Stoker Control

17

0.5 A

MAX LOAD

COMPONENT

0.75 A 1.25 A

MAX LOAD MAX LOAD

RECEPTACLES - ON SIDE

 

 

 

VERTI - FLOW ™

STOKER CONTROL

Verti-FlowStoker Control

This section describes the features and operations of the Harman Verti-FlowStoker Control. The timers are adjustable from 0 minutes to 15 minutes in 1 minute steps. There are red lights on the front panel to show proper op- eration of the timer. One indicator shows power is applied to the unit. The other three indicators show when power is available at the adjacent receptacle.

The stoker control will be mounted on the side panel of the feeder directly below the coal hopper. The three re- ceptacles and switch will be facing forward while the power cord, 3 AMP fuse access port and the thermostat connections will be to the rear.

Image 17
Contents VF3000 Coal Stoker Boiler Page Contents Introduction Hot Water Coil Specifications/Hot Water CoilNever sleep in the same room with any coal burning stove WarningsPacking List Assembly Grate AssemblyFeeder Grates and Firebrick 10AssemblyDraft Venting11Chimney 12VentingDo not connect to any air distribution duct or system Venting13Aquastat and Wiring 14InstallationBasic Plumbing InstallationClearances Installation 16InstallationVerti-FlowStoker Control Verti-Flow Stoker ControlVerti-Flow Stoker Control How to operate the Stoker ControlStarting a fire Feed AdjustmentOperation19 Ash Removal 20MaintenanceWeekly Every 3 monthsAnnually Maintenance21Stoker Control Troubleshooting 22TroubleshootingFeeding Problems A350My350, s350 Aquastat Installation24AQUASTAT Feeder Parts List Coal Wiring Diagram & FuelVF3000 At har Harman Central Heating Products Limited Warranty Warranty2930Notes