Harman VF3000 manual Assembly

Page 8

Assembly

Top

Left Side

Hopper

 

Support

 

Front

Door

 

Blank

 

Hopper - Sold

Boiler

separately

Cleaning Rod

 

 

Spring Handle

Adapter

Right Side

Plate

 

 

Baffle

Base Jacket

Clean out slide

 

Flue Pipe

Base

Ash Tub

Flue Plate

The VF3000 is reversible as to which end the hopper and flue pipe are located. Therefore, a decision must be made as to which way will work best for your situation.

If you woud like to have the flue to the right and the hopper to the left, make sure the gaskets are in place on both the flue pipe and flue plate. Bolt the flue pipe on the right end and the flue plate on the left end of the base. Next, the baffle must be slid into place on the right end with the center of the base. Note the baffle and flue pipe must always be at the same end and opposite the hopper.

Next, place the base jacket around the base and clamp into place with the four clamping bolts on the front of the base. The hole in the jacket goes around the flue pipe.

Ash Door

Place 1/4” x 1” gasket around the flat edge on top of the base. Now place the boiler on top of the base with the feeder opening opposite the flue pipe. Place 1/4” x 1” gasket around the door openings on the boiler. Bolt the door mount on the front door opening with 5/16” x 1” flat head bolts. Bolt the door blank on the rear opening with 5/16” x 1” hex head bolts.

Now the outer jacket can be installed. The front jacket with the coil hole must be installed first. Next, the two sides which hold the front in place and then the top which holds the sides in place.

Image 8
Contents VF3000 Coal Stoker Boiler Page Contents Introduction Specifications/Hot Water Coil Hot Water CoilWarnings Never sleep in the same room with any coal burning stovePacking List Assembly Grate AssemblyFeeder 10Assembly Grates and FirebrickVenting11 Draft12Venting ChimneyVenting13 Do not connect to any air distribution duct or system14Installation Aquastat and WiringInstallation Basic Plumbing16Installation Clearances InstallationVerti-Flow Stoker Control Verti-FlowStoker ControlHow to operate the Stoker Control Verti-Flow Stoker ControlStarting a fire Feed AdjustmentOperation19 20Maintenance Ash RemovalWeekly Every 3 monthsMaintenance21 AnnuallyStoker Control Troubleshooting 22TroubleshootingFeeding Problems Aquastat Installation A350My350, s35024AQUASTAT Feeder Parts List Wiring Diagram & Fuel CoalVF3000 At har Warranty29 Harman Central Heating Products Limited Warranty30Notes