16Installation
Clearances
Installation
Place the boiler a minimum of 18” from a wall. The flue pipe must be at least 18” from anything combustible. The rear of the hopper should be a minimum of 36” from the wall. The boiler should be placed on a
Draft Test Procedure
Attach a draft meter to the vent pipe on the boiler side of the barometric damper (if installed). With a fire established, the chimney draft should be between
DO NOT operate if the flue draft exceeds
Column (
Next, remove the allen head set screw from the center of the firebox door and attach your draft meter. The firebox draft should be
Combustion Blower
Restrictor Plate |