Lochinvar 1 service manual Sequence of operation space heating and HW

Page 10

Service Manual

1 Service

Sequence of operation

Table 1A Sequence of operation - space heating and HW

Note: This unit is equipped with two (2) independent, but synchronized combustion systems. Heat Exchanger 1 (top) combustion system will fire first. If the demand cannot be met by one (1) combustion system the same sequence of operation will be followed to bring the Heat Exchanger 2 combustion system online.

1.Upon a call for heat, the control turns on the appropriate pumps (system and boiler pumps for a space heating call, HW pump relay output for a HW call).

2.The control confirms that the low water cutoff and flow switch (optional) contacts are closed.

3.The control starts the blower and closes the louver contacts to begin the Pre-Purge cycle.

4.The control confirms that the blower comes up to the desired speed, the flap valve opens, and the air pressure switch, gas pressure switches, louver proving switch (field installed), and blocked drain switch contacts close.

5.Once the Pre-Purge cycle is complete, the control lowers the blower speed, initiates sparking of the ignition electrode, and opens the gas valve.

6.After a short wait, the control stops sparking and checks for the presence of flame current through the spark and flame sense electrodes.

7.If the control does not detect flame current, the control will lockout, until the RESET button on the touch screen LCD is pressed.

If the control detects flame current, the control will hold the blower speed constant for a few seconds to allow the

8.flame to stabilize, then begin modulating the firing rate in order to maintain the controlling sensor to the desired set point temperature.

If the current call for heat is for space heating and a HW call for heat becomes active, the control will turn on the HW

9.pump relay output, then turn off the boiler pumps. It will then modulate the blower speed in order to maintain the outlet temperature to the desired HW outlet set point temperature.

If the first heat exchanger in the boiler is unable to maintain the desired set point temperature, the second heat exchanger in the boiler will be started, using much of the same sequences as described above. Once both heat

10.exchangers are firing, the controls will work in synchronization to maintain the desired set point temperature. If the heat load should decrease sufficiently, the second heat exchanger will be shut down, much like the sequences described below.

11.Once both the space heating and HW calls for heat are satisfied, the control will turn off the gas valve and begin the Post-Purge cycle. Any pumps that are running will begin their respective Pump Delay cycles.

12.At the end of the Post-Purge cycle, the louver contacts will open.

13.The control verifies that the blower stops running and the flap valve closes.

14.At the end of the Pump Delay cycle(s), the pumps will be turned off.

10

Image 10 Contents
Models 1.0, 1.3, Contents Handling ceramic fiber materials Niosh stated First AidMaintenance ServiceTroubleshooting Service Near boiler pipingSync display Control inputs BoardSecondary Smart Touch Control Module Primary Control outputsHow the control module operates General OperationHow the boiler operates Sequence of operationSequence of operation Sequence of operation space heating and HWThis table lists the parameters and where to access them Parameter tableOutdoor Reset Viewable and changeable control parameters Status ScreenService Details Screen Service Main Screen Setup Screen Service/Setup Parameters Screen Service Set Point Parameters Screen Outdoor Reset Parameters Screen Service Night Setback Parameters Screen Cascade Parameters Screen Cascade OperationPumps Parameters Screen 10Vdc BMS Parameters Screen 10Vdc OperationService Cascade Screen Service Temps Screen Burners Screen Graph Select Screen History Screen Service Mode Screen Maintenance Maintenance and annual startup Inspect boiler area Address reported problemsClean condensate trap Inspect boiler interiorCheck water system Flue vent system and air pipingCheck expansion tank Check boiler relief valve Check control settings Check ignition ground wiringCheck all boiler wiring Inspect ignition and flame sense electrodesCleaning boiler heat exchanger Check flame signalReview with owner Test procedure Test low water flow conditionsTroubleshooting Alarm ScreenCheck the following Before troubleshootingCheck control module fuses Operation No DisplayNo Burner Unit DoesChecking temperature sensors Temperature ResistanceOperation Boiler Pump NoisyNo Pump System PumpDrain Blocked Flow SwitchCondensate Flame outFlame Lost Light cont’dWhile Running Troubleshooting Temp SW Automatic ResetHigh Limit / HEX Blower RPM’sSensor Open Louver Proving SwitchToo High Sensor ShortedLow Resets Try LaterAir Flow Too Flap ValveWriting to Internal FaultNo Error Stored MemosOr Obstruction Combustion Analysis ProcedureGas Valve Adjustment Gas Supply PressureModel Gas valve adjustment procedureModels 1.3
Related manuals
Manual 20 pages 6.19 Kb Manual 16 pages 33.86 Kb Manual 80 pages 59.46 Kb Manual 56 pages 40.75 Kb