Burnham SM-6 manual Follow These Operating Instructions

Page 14

NOTE: YOUR BOILER IS EQUIPPED WITH A HONEYWELL VR8204 OR VR8304 GAS VALVE. PLEASE

FOLLOW

THESE OPERATING INSTRUCTIONS:

14

Image 14
Contents Spacemastertm Important Information Please Read this page Carefully Table of Contents General Installation Requirements Boiler Location Must Meet the Following Site RequirementsMinimum Clearance to Combustible Surfaces ½ 1.6 ft ¾ 2.1 ft II. Installation Instructions Vent System Cross Section Oxygen Corrosion Recommended Boiler Piping Page Electric Wiring Installation Inspect Installation Before Starting Initial Start III. Operating InstructionsFollow These Operating Instructions Schematic Wiring Diagram Ladder Wiring Diagram Sequence of Operation Trouble Shooting Check GAS Input Rate to BoilerPage Page Page Typical Pilot Flame Main Burner Flame Removal of Burner Assembly IV. ServiceBurners and Firebox should be Cleaned Annually Maintenance of LOW Water CutoffLubrication Avoid Breathing Fiber Particulates and Dust Repair Parts VI. Low Water Cut Off Lwco WhenLimited Warranty