Burnham
SM-6
manual
Ladder Wiring Diagram
Troubleshooting
Install
Repair Parts
Schematic Wiring Diagram
Warranty
Removal of Burner Assembly
Page 16
Figure 12
LADDER WIRING DIAGRAM
16
Page 15
Page 17
Image 16
Page 15
Page 17
Contents
Spacemastertm
Important Information Please Read this page Carefully
Table of Contents
General Installation Requirements
Boiler Location Must Meet the Following Site Requirements
Minimum Clearance to Combustible Surfaces
½ 1.6 ft ¾ 2.1 ft
II. Installation Instructions
Vent System Cross Section
Oxygen Corrosion
Recommended Boiler Piping
Page
Electric Wiring Installation
Inspect Installation Before Starting Initial Start
III. Operating Instructions
Follow These Operating Instructions
Schematic Wiring Diagram
Ladder Wiring Diagram
Sequence of Operation
Trouble Shooting
Check GAS Input Rate to Boiler
Page
Page
Page
Typical Pilot Flame Main Burner Flame
IV. Service
Burners and Firebox should be Cleaned Annually
Removal of Burner Assembly
Maintenance of LOW Water Cutoff
Lubrication
Avoid Breathing Fiber Particulates and Dust
Repair Parts
VI. Low Water Cut Off Lwco
When
Limited Warranty
Top
Page
Image
Contents