I. General Installation Requirements

1INSPECT SHIPMENT carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed. Our responsibility ceases upon delivery of Boiler to the carrier in good condition. Any claims for damage or shortage in shipment must be filed immediately against the carrier by the consignee. No claims for variances or shortages will be allowed by Boiler Manufacturer, unless presented within sixty (60) days after receipt of equipment.

2BOILER INSTALLATION must conform to the requirements of the authority having jurisdiction, or in absence of such requirements to:

a.“National Fuel Gas Code, ANSI Z223.1 obtainable from the American Gas Association, 1515 Wilson

Blvd. Arlington (Rosslyn), VA 22209.

b.When required by the authority having jurisdiction, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired boilers, No. CSD-1.

c.The boiler must be electrically grounded in accordance with requirements of the authority having jurisdiction or, in the absence of such requirements, with the National Electrical Code, ANSI/NFPA No. 70.

3THESE GAS BOILERS ARE DESIGN CERTIFIED FOR INSTALLATION on an exterior wall of buildings constructed with combustible materials (wood framed walls with, paneling, drywall, plaster, etc.) or masonry walls (brick, stone, stucco, or cinder block).

4DO NOT INSTALL ON CARPETING. These gas boilers may be installed above carpeted areas. Note: Protect carpeting or flooring to avoid possible damage during installation and maintenance procedures.

5BOILER LOCATION MUST MEET THE FOLLOWING SITE REQUIREMENTS:

a.The boiler must be mounted on a flat wall,

sufficiently strong enough to carry the weight of the unit. (See Figure 1). Minimum acceptable wall construction would consist of 2” x 4” studding on 24” centers. Unit is designed for installation on 16” centers. Therefore, adequate supports must be added between existing studding.

b.A suggested mounting height, where practical, is five feet - six inches from floor to center line of intake air duct opening. (See Figure 1).

NOTE: depending on ceiling height, 6” combustible clearance height from jacket top panel to ceiling must be maintained. (See Figure 3).

c.Consider location of heating supply and return lines, gas supply line, cold water piping and expansion tank in selecting boiler location.

d.Exterior wall surface must be flat to ensure that wall flange can be mounted without being distorted and also provide a positive weather-tight seal to prevent water damage.

If exterior wall surface is not flat (i.e., uneven masonry, stucco, aluminum siding, etc.) a flat surface must be provided of equal size or larger than the exterior wall flange and vent terminal cover.

e.Locate the vent terminal in relation to adjacent public walkways, adjacent buildings, operable windows and buildings, consistent with the National Fuel Gas Code Z223.1: Minimum clearance of

4 feet horizontally from and in no case above or below (unless four [4] foot horizontal distance is maintained), electric meters, gas meters, regulators and relay equipment. At least 12” from any door, window or other building opening. A minimum of 12” above grade, 7” from any overhang, 18” from any side obstruction or wall and 3’ away from any adjacent building. Increase minimum height above grade to maintain adequate clearance above average snow fall for geographical area in which unit is installed. If the unit is to be vented over a public walkway, it must be at least 7” above grade. If the vent terminal is to be within 10’ of a building fresh air intake, it must be at least 3’ above the opening. In addition, avoid venting the unit in corners, niches or areas which might have reduced fresh air circulation. (See Figure 2).

Figure 2

f.If boiler is to be installed above the level of the radiation, a low water cutoff must be installed.

6PROVIDE CLEARANCE between boiler jacket, mounting bracket and vent system and combustible material in accordance with local fire ordinance.

4

Image 4
Contents Spacemastertm Important Information Please Read this page Carefully Table of Contents General Installation Requirements Boiler Location Must Meet the Following Site RequirementsMinimum Clearance to Combustible Surfaces ½ 1.6 ft ¾ 2.1 ft II. Installation Instructions Vent System Cross Section Oxygen Corrosion Recommended Boiler Piping Page Electric Wiring Installation Inspect Installation Before Starting Initial Start III. Operating InstructionsFollow These Operating Instructions Schematic Wiring Diagram Ladder Wiring Diagram Sequence of Operation Trouble Shooting Check GAS Input Rate to BoilerPage Page Page Typical Pilot Flame Main Burner Flame IV. Service Burners and Firebox should be Cleaned AnnuallyRemoval of Burner Assembly Maintenance of LOW Water CutoffLubrication Avoid Breathing Fiber Particulates and Dust Repair Parts VI. Low Water Cut Off Lwco WhenLimited Warranty

SM-6 specifications

The Burnham SM-6 is a high-performance modular boiler designed for commercial and industrial applications. Known for its efficiency and reliability, the SM-6 is engineered to meet a wide range of heating demands while maintaining low operational costs.

One of the standout features of the SM-6 is its modular design. This allows for scalable installations, catering to varying heating needs without requiring extensive modifications. The boiler can operate independently or in conjunction with other units, providing flexibility that is essential for industries with fluctuating demands.

In terms of technology, the Burnham SM-6 utilizes advanced combustion technology to achieve high efficiency rates. The unit typically operates with a stellar thermal efficiency of around 85% to 90%, minimizing fuel consumption and reducing greenhouse gas emissions. The incorporation of electronic ignition further helps in conserving energy, as it eliminates the need for a standing pilot light.

The SM-6 is made from high-quality materials designed for durability and long service life. The heat exchanger is constructed with durable steel, enabling it to withstand high temperatures and pressures. This robust construction ensures reliability in demanding environments, mitigating the risk of breakdowns and enhancing overall productivity.

Another key characteristic of the Burnham SM-6 is its user-friendly control system. The boiler is equipped with a state-of-the-art control panel that provides operators with real-time data on performance metrics. This allows for proactive maintenance and performance optimization, enhancing the overall operational efficiency of the system.

Safety is also a paramount consideration in the design of the SM-6. It includes multiple safety features, such as pressure relief valves and electronic safety checks, to prevent dangerous operating conditions. These features ensure that the boiler can run safely over extended periods, providing peace of mind for facility managers.

In conclusion, the Burnham SM-6 boiler stands out in the market for its modular design, high efficiency, durable construction, and advanced control technologies. Its versatile nature makes it an excellent choice for various applications, from manufacturing facilities to commercial buildings, ensuring it meets the heating requirements of diverse industries effectively. The combination of efficiency, reliability, and safety solidifies the Burnham SM-6 as a leading solution in the realm of heating systems.