Burnham SM-6 manual Important Information Please Read this page Carefully

Page 2

IMPORTANT INFORMATION

PLEASE READ THIS PAGE CAREFULLY

This boiler has a limited warranty, a copy of which is printed on the back page of this manual.

All heating systems should be designed by competent contractors and only persons knowledgeable in the layout and installation of hydronic heating systems should attempt installation of any boiler.

This equipment shall be installed in accordance with those installation regulations in force in the area where the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made.

Boiler should be positioned to provide minimum side clearances of 1”, minimum top clearance of 6”, minium front clearance of 2”, minimum rear and flue system clearances of 0” and minimum floor clearance of 6” between boiler surfaces and any combustible materials. (See Figure 3).

Boiler must also be positioned to provide minimum clearances between edge of vent terminal and exterior obstructions. Provide minimum overhang clearance of 7”, minimum above grade clearance of 12” and minimum side obstruction clearance of 18”. (See Figure 2).

In all cases, clearance between boiler jacket and vent system surfaces and combustible materials must comply with the National Fuel Gas Code, ANSI Z223.1, and local jurisdictions.

Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors and liquids.

Do not place any obstruction in the boiler room that will hinder the flow of ventilating air.

Boiler must be installed with the vent/intake air system supplied as part of the unit, without alteration.

The wall thickness through which the unit may be installed must not exceed a minimum of 5” or a maximum of 15”.

a.Misc. Parts Carton — Part No. 6050301 (5” to 9” thick walls) — Standard

b.Misc. Parts Carton — Part No. 6050302 (9” to 15” thick walls) — Optional

The boiler shall be installed such that the gas ignition system components are protected from water (dripping, spraying, rain etc.). during boiler operation and service (circulator replacement, control replacement, etc.).

It is the responsibility of the installing contractor to see that all controls are operating properly when the installation is completed.

Service on this boiler should be undertaken only by trained and skilled personnel.

Post instructions near boiler for reference by owner and serviceman.

Maintain instructions in legible condition.

WARNING

When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for proper venting of the appliances remaining connected to it.

a.Seal any unused openings in the common venting system.

b.Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.

c.Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system.

Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.

d.Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliance will operate continuously.

e.Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar or pipe.

f.After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas burning appliance to their previous conditions of use.

g.Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Part 11 in the National Fuel Gas Code, ANSI Z223.1.

2

Image 2
Contents Spacemastertm Important Information Please Read this page Carefully Table of Contents General Installation Requirements Boiler Location Must Meet the Following Site RequirementsMinimum Clearance to Combustible Surfaces ½ 1.6 ft ¾ 2.1 ft II. Installation Instructions Vent System Cross Section Oxygen Corrosion Recommended Boiler Piping Page Electric Wiring Installation Inspect Installation Before Starting Initial Start III. Operating InstructionsFollow These Operating Instructions Schematic Wiring Diagram Ladder Wiring Diagram Sequence of Operation Trouble Shooting Check GAS Input Rate to BoilerPage Page Page Typical Pilot Flame Main Burner Flame Removal of Burner Assembly IV. ServiceBurners and Firebox should be Cleaned Annually Maintenance of LOW Water CutoffLubrication Avoid Breathing Fiber Particulates and Dust Repair Parts VI. Low Water Cut Off Lwco WhenLimited Warranty

SM-6 specifications

The Burnham SM-6 is a high-performance modular boiler designed for commercial and industrial applications. Known for its efficiency and reliability, the SM-6 is engineered to meet a wide range of heating demands while maintaining low operational costs.

One of the standout features of the SM-6 is its modular design. This allows for scalable installations, catering to varying heating needs without requiring extensive modifications. The boiler can operate independently or in conjunction with other units, providing flexibility that is essential for industries with fluctuating demands.

In terms of technology, the Burnham SM-6 utilizes advanced combustion technology to achieve high efficiency rates. The unit typically operates with a stellar thermal efficiency of around 85% to 90%, minimizing fuel consumption and reducing greenhouse gas emissions. The incorporation of electronic ignition further helps in conserving energy, as it eliminates the need for a standing pilot light.

The SM-6 is made from high-quality materials designed for durability and long service life. The heat exchanger is constructed with durable steel, enabling it to withstand high temperatures and pressures. This robust construction ensures reliability in demanding environments, mitigating the risk of breakdowns and enhancing overall productivity.

Another key characteristic of the Burnham SM-6 is its user-friendly control system. The boiler is equipped with a state-of-the-art control panel that provides operators with real-time data on performance metrics. This allows for proactive maintenance and performance optimization, enhancing the overall operational efficiency of the system.

Safety is also a paramount consideration in the design of the SM-6. It includes multiple safety features, such as pressure relief valves and electronic safety checks, to prevent dangerous operating conditions. These features ensure that the boiler can run safely over extended periods, providing peace of mind for facility managers.

In conclusion, the Burnham SM-6 boiler stands out in the market for its modular design, high efficiency, durable construction, and advanced control technologies. Its versatile nature makes it an excellent choice for various applications, from manufacturing facilities to commercial buildings, ensuring it meets the heating requirements of diverse industries effectively. The combination of efficiency, reliability, and safety solidifies the Burnham SM-6 as a leading solution in the realm of heating systems.