Burnham RSA manual ‘A’

Page 43

ITEM

QTY.

DESCRIPTION

PART NUMBER

 

 

 

 

1

2

Wing Nut, 1/4 -20

80860910

 

 

 

 

2

10

Washer, Flat 1/4 (SAE)

80860633

 

 

 

 

3

1

Canopy Assembly

6113509

 

 

 

 

4

2

1/2” Thick x 1” x 12-3/8” Cerafelt Strip

9206005

 

 

 

 

5

2

1/2” Thick x 1” x 12-3/8” Cerafelt Strip

9206005

 

 

 

 

6

2

Carriage Bolt, 1/4 -20 x 3” Lg.

80860119

 

 

 

 

7

‘A’

Turbulator

7116037

8

1

Heat Exchanger Assembly

‘B’

9

10

SA307B 3/8 -16 x 1-1/4” Bolt

80861360

 

 

 

 

10

1

Tankless Heater Gasket

8206036

 

 

 

 

11

1

Tapped Heater Cover Plate

7036030

 

 

 

 

12

1

Tankless Heater Coil, (Standard S350) (Includes Item 10)

6033509

 

 

Tankless Heater Coil, (Optional S375) (Includes Item 10)

6033510

 

 

 

 

 

 

13

10

Washer, Flat (USS), 3/8”

80860645

 

 

 

 

14

10

Hex Nut, 3/8 -16, Steel, Plain

80860400

 

 

 

 

15

2

1/2” Thick x 2” x 13-3/4” Cerafelt Strip

9206003

 

 

 

 

16

2

1/2” Thick x 2” x 18-1/2” Cerafelt Strip

9206003

 

 

 

 

17

1

Combustion Chamber

8203006

 

 

 

 

18

1

Cerablanket

8203512

 

 

 

 

19

1

Base Assembly

6183508

 

 

 

 

20

4

Machine Screw, Hex Head, 1/4 -20 x 1-1/4”

80860810

 

 

 

 

21

4

Hex Nut, 1/4 -20 (Heavy Hex)

80860407

 

 

 

 

BOILER MODEL

‘A’

‘B’

 

 

 

RSA85

12

603350112

 

 

 

RSA110

16

603350116

 

 

 

RSA125

12

603350212

 

 

 

RSA135

16

603350216

 

 

 

43

Image 43
Contents 8143508R21-1/10 Price $3.00 RSA SeriesImportant Information Read Carefully Page Page Table of Contents RSA Packaged Boiler RSA170 / RSA285 Do not drop boiler. Do not bump boiler jacket against floor Pre-InstallationPage Installing the Jacket II. Knock-Down Boiler AssemblyRemoval of Boiler Burner Mounting Installation of Boiler ControlsThis page is Left Intentionally Blank III. Water Piping and Trim Page Page Page Page Schematic Tankless Heater Piping Tankless Heater Ratings IV. Venting Recommended Smoke Pipe Arrangement and Chimney Requirements General ElectricalRsal Wiring Less Tankless, Single Circulator Circulator Zoned Wiring for Honeywell R8888 Zone Valve Zoned Wiring for R8889 Page Page Circulator Zoning with EC5000 Wiring Schematic SchematicWiring EC5000with ZonedValve Zone19 VI. Oil Piping Single-Pipe InstallationTwo-Stage Units 3450 RPM Two Pipe Systems Single-Stage Units 3450 RPM Two Pipe SystemsVII. System Start-Up High Limit Controller LED Error CodesDisplay Readout OperationL7224 / L7248 Controller Operating Sequence Trouble Shooting GuideLOW Limit and Circulator Controller Beckett Burner Carlin EZ-1HP Burner Beckett AFG, AF, & SF BurnersBecket AFG Burner Carlin EZ-2HP BurnerOther Adjustments Remove GUN AssemblyVerify OIL Burner Settings Before Starting Adjust OIL PressureHints on Combustion High Altitude InstallationsVerify High Limit Operation Test ControlsUse Part Number 6183505 for the following models Clean the Firetubes VIII. Service and CleaningAvoid Breathing Fiber Particulates and Dust IX. Repair Parts Fogire 28 Assembled Boiler Description Part NumberRSA85-135 Bare Boiler Repair Parts ‘A’ RSA170-285 Boiler Repair Parts Jacket Top Panel Assembly Beckett Burner Parts List for RSA Series Steel Boilers Ordering Information for Quality Replacement Parts AF60XO AF60XP SF60FY Beckett AF and SF Model Burners Low Water Cut Off Lwco Wiring of Typical LwcoLwco Location Service Record Limited Warranty

RSA specifications

Burnham RSA is a prominent figure in the renewable energy sector, specializing in the development and management of renewable energy projects across various scales. The company has established a strong reputation for its commitment to sustainability and innovation, embracing advanced technologies and methodologies to maximize energy efficiency and minimize environmental impact.

At the heart of Burnham RSA's operations lies a diverse portfolio of renewable energy sources, including solar, wind, and biomass. The company's flagship projects often showcase cutting-edge solar photovoltaic (PV) technology, which effectively converts sunlight into electricity. By utilizing high-efficiency solar panels, Burnham RSA can ensure maximum energy generation, even in less-than-ideal weather conditions.

Wind energy is another critical component of Burnham RSA's strategy. The deployment of state-of-the-art wind turbines at strategic locations allows for optimal harnessing of wind energy. These turbines are equipped with advanced control systems that optimize their performance by adjusting their orientation and blade pitch to maximize energy capture based on real-time wind conditions.

In addition to solar and wind, Burnham RSA is actively exploring biomass energy solutions, which involve converting organic materials into usable energy. This approach not only provides a renewable energy source but also contributes to waste reduction, as agricultural and forestry residues can be repurposed to generate power.

Burnham RSA places a strong emphasis on sustainability, ensuring that all projects are designed with environmental considerations at the forefront. The company adheres to rigorous standards for environmental impact assessments and works closely with local communities to promote awareness and education about renewable energy benefits.

Smart grid technology is another area where Burnham RSA excels. By implementing advanced grid management systems and energy storage solutions, the company enhances the reliability and efficiency of renewable energy distribution. These systems allow for better integration of various energy sources, ensuring a stable energy supply even during peak demand periods.

Furthermore, Burnham RSA is committed to continuous innovation, investing in research and development to improve existing technologies and explore new avenues for energy production. This proactive approach not only fosters growth within the company but also contributes positively to the broader renewable energy landscape.

In summary, Burnham RSA stands out in the renewable energy sector through its comprehensive use of solar, wind, and biomass technologies, commitment to sustainability, and focus on innovation. With its advanced systems and community engagement efforts, Burnham RSA is poised to play a significant role in shaping the future of renewable energy.