Burnham SCG manual

Page 3

WARNING

This boiler requires regular maintenance and service to operate safely. Follow the instructions contained in this manual.

Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life. Read and understand the entire manual before attempting installation, start-up operation, or service. Installation and service must be performed only by an experienced, skilled, and knowledgeable installer or service agency.

This boiler must be properly vented.

This boiler needs fresh air for safe operation and must be installed so there are provisions for adequate combustion and ventilation air.

The interior of the venting system must be inspected and cleaned before the start of the heating season and should be inspected periodically throughout the heating season for any obstructions. A clean and unobstructed venting system is necessary to allow noxious fumes that could cause injury or loss of life to vent safely and will contribute toward maintaining the boiler's efficiency.

Installation is not complete unless a pressure relief valve is installed into the tapping located on top of appliance. - See the Water Piping and Trim Section of this manual for details.

This boiler is supplied with safety devices which may cause the boiler to shut down and not re-start without service. If damage due to froz en pipes is a possibility, the heating system should not be left unattended in cold weather; or appropriate safeguards and alarms should be installed on the heating system to prevent damage if the boiler is inoperative.

This boiler contains very hot water under high pressure. Do not unscrew any pipe fittings nor attempt to disconnect any components of this boiler without positively assuring the water is cool and has no pressure. Always wear protective clothing and equipment when installing, starting up or servicing this boiler to prevent scald injuries. Do not rely on the pressure and temperature gauges to determine the temperature and pressure of the boiler. This boiler contains components which become very hot when the boiler is operating. Do not touch any components unless they are cool.

Boiler materials of construction, products of combustion and the fuel contain alumina, silica, heavy metals, carbon monoxide, nitrogen oxides, aldehydes and/or other toxic or harmful substances which can cause death or serious injury and which are known to the state of California to cause cancer, birth defects and other reproductive harm. Always use proper safety clothing, respirators and equipment when servicing or working nearby the appliance.

Failure to follow all instructions in the proper order can cause personal injury or death. Read all instructions, including all those contained in component manufacturers manuals which are provided with the boiler before installing, starting up, operating, maintaining or servicing.

Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors or liquids.

All cover plates, enclosures and guards must be in place at all times.

NOTICE

This boiler has a limited warranty, a copy of which is printed on the back of this manual.

It is the responsibility of the installing contractor to see that all controls are correctly installed and are operating properly when the installation is complete.

3

Image 3
Contents SCG Important Information Read Carefully Page Table of Contents Dimensions Provide combustion and ventilation air in accordance Pre-InstallationInstallation must conform to the requirements Appliance is design certified for installation onDo not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerSee Section III. Venting / Air Intake PipingVent System Components Part Number General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Install Air Intake Piping. See Figures 10 Combination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 SCG-5 & SCG-6 General Installation Requirements Pre-Installation ConsiderationsPage Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air 3 or 4 Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim How to Test How to WireSupply Water Manifold Piping Page Page Gravity Factor Gas PipingRecommended Gas Piping Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page VII. Modular Installation Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Sequence of Operation Check limit Adjust gas input rate to boilerLow water cutoff if so equipped IX. ServiceMain Burners and Firebox Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Pilot Burner Location Procedure for Measuring Differential Pressure See FigurePage Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty

SCG specifications

Burnham SCG, short for Burnham Smart City Grid, represents a groundbreaking initiative aimed at reshaping urban landscapes through the integration of modern technologies and sustainable practices. Situated in the heart of a growing metropolis, Burnham SCG embodies the principles of smart city design, focusing on creating an efficient, interconnected environment that enhances the quality of life for its residents.

One of the key features of Burnham SCG is its extensive use of Internet of Things (IoT) technology. This infrastructure enables real-time data collection from various sensors strategically placed throughout the city. For instance, smart streetlights equipped with sensors adjust their brightness based on ambient light conditions and pedestrian activity, effectively reducing energy consumption. This use of IoT extends to waste management, where smart bins signal when they are full, optimizing collection routes and minimizing fuel consumption.

In addition to IoT, Burnham SCG places a strong emphasis on renewable energy sources. The city integrates solar panels across public buildings and utilizes wind turbines in designated areas, contributing to a significant reduction in carbon emissions. Furthermore, an advanced battery storage system ensures that excess energy generated during peak production times is efficiently stored and used during high-demand periods, promoting energy resilience.

Transportation in Burnham SCG embraces the future with integrated smart mobility solutions. A robust network of electric vehicle charging stations encourages the adoption of eco-friendly transportation. The city also features a user-friendly app that provides real-time information about public transport schedules, bike-sharing availability, and traffic conditions, making it easier for residents to navigate their daily commute.

The urban design of Burnham SCG prioritizes green spaces and walkability. Urban planners have designed parks and pedestrian-friendly pathways that encourage outdoor activities and community engagement. These green areas not only enhance urban aesthetics but also contribute to improved air quality and biodiversity.

Lastly, community involvement stands at the core of Burnham SCG’s framework. The city regularly engages its residents through public forums and digital platforms, ensuring that their voices are heard in decision-making processes regarding urban development and sustainability initiatives.

In summary, Burnham SCG is a visionary model of a smart city that integrates technology, sustainability, and community engagement. With its innovative features and forward-thinking policies, it sets a benchmark for future urban developments around the world.