Burnham SCG manual Check limit, Adjust gas input rate to boiler

Page 67

O.Check limit.

1.Adjust thermostat to highest setting.

2.Observe temperature gauge. When temperature is indicated, adjust limit to setting below observed temperature. Main burners and pilot burner should extinguish, and blower should stop.

3.Adjust limit to setting above observed temperature. Ignition sequence should begin.

4.Adjust thermostat to lowest setting. Adjust limit to desired setting.

P.Adjust gas input rate to boiler.

1.Adjust thermostat to highest setting.

2.Check manifold gas pressure. See Table 5 or rating label located in the boiler’s vestibule compartment. Adjust gas valve pressure regulator as necessary (turn adjustment screw counterclockwise to decrease manifold pressure, or clockwise to increase manifold pressure). If pressure cannot be attained, check gas valve inlet pressure. If less than minimum indicated in Table 5 or boiler’s rating label, contact gas supplier for assistance.

3.Clock gas meter for at least 30 seconds. Use Table 10 to determine gas flow rate in Cubic Feet per Hour.

WARNING

Failure to properly adjust gas input rate will result in over firing or under firing of the appliance. Improper and unsafe boiler operation may result.

4.Determine Input Rate. Multiply gas flow rate by gas heating value.

5.Compare measured input rate to input rate stated on rating plate.

a.Boiler must not be over fired. Reduce input rate by decreasing manifold pressure. Do not reduce more than 0.3 inch w.c. If boiler is still overfired, contact your Burnham distributor or Regional Office for replacement Gas Orifice.

b.Increase input rate if less than 98% of rating plate input. Increase manifold gas pressure no

more than 0.3 inch w.c. If measured input rate is still less than 98% of rated input:

i.Remove Main Burners per procedure in Section IX: Service.

ii.Remove gas orifices. Drill one (1) drill size larger (drill size is stamped on orifice, or see Section X: Repair Parts).

iii.Reinstall gas orifices and main burners. Measure input rate.

6.Recheck Main Burner Flame.

7.Return other gas-fired appliances to previous conditions of use.

Q.Review User’s Information Manual and system operation with owner or operator.

Table 10: Gas Flow Rate in Cubic Feet

Per Hour

Seconds

Size of Gas Meter Dial

 

 

 

for One

 

 

 

One-Half

One

Two

Revolution

Cu. Ft.

Cu. Ft.

Cu. Ft.

 

 

 

 

 

30

60

120

240

 

 

 

 

32

56

113

225

 

 

 

 

34

53

106

212

 

 

 

 

36

50

100

200

 

 

 

 

38

47

95

189

 

 

 

 

40

45

90

180

 

 

 

 

42

43

86

172

 

 

 

 

44

41

82

164

 

 

 

 

46

39

78

157

 

 

 

 

48

37

75

150

 

 

 

 

50

36

72

144

 

 

 

 

52

35

69

138

 

 

 

 

54

33

67

133

 

 

 

 

56

32

64

129

 

 

 

 

58

31

62

124

 

 

 

 

60

30

60

120

 

 

 

 

67

Image 67
Contents SCG Important Information Read Carefully Page Table of Contents Dimensions Provide combustion and ventilation air in accordance Pre-InstallationInstallation must conform to the requirements Appliance is design certified for installation onDo not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerSee Section III. Venting / Air Intake PipingVent System Components Part Number General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Install Air Intake Piping. See Figures 10 Combination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 SCG-5 & SCG-6 General Installation Requirements Pre-Installation ConsiderationsPage Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air 3 or 4 Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim How to Test How to WireSupply Water Manifold Piping Page Page Gravity Factor Gas PipingRecommended Gas Piping Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page VII. Modular Installation Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Sequence of Operation Check limit Adjust gas input rate to boilerLow water cutoff if so equipped IX. ServiceMain Burners and Firebox Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Pilot Burner Location Procedure for Measuring Differential Pressure See FigurePage Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty

SCG specifications

Burnham SCG, short for Burnham Smart City Grid, represents a groundbreaking initiative aimed at reshaping urban landscapes through the integration of modern technologies and sustainable practices. Situated in the heart of a growing metropolis, Burnham SCG embodies the principles of smart city design, focusing on creating an efficient, interconnected environment that enhances the quality of life for its residents.

One of the key features of Burnham SCG is its extensive use of Internet of Things (IoT) technology. This infrastructure enables real-time data collection from various sensors strategically placed throughout the city. For instance, smart streetlights equipped with sensors adjust their brightness based on ambient light conditions and pedestrian activity, effectively reducing energy consumption. This use of IoT extends to waste management, where smart bins signal when they are full, optimizing collection routes and minimizing fuel consumption.

In addition to IoT, Burnham SCG places a strong emphasis on renewable energy sources. The city integrates solar panels across public buildings and utilizes wind turbines in designated areas, contributing to a significant reduction in carbon emissions. Furthermore, an advanced battery storage system ensures that excess energy generated during peak production times is efficiently stored and used during high-demand periods, promoting energy resilience.

Transportation in Burnham SCG embraces the future with integrated smart mobility solutions. A robust network of electric vehicle charging stations encourages the adoption of eco-friendly transportation. The city also features a user-friendly app that provides real-time information about public transport schedules, bike-sharing availability, and traffic conditions, making it easier for residents to navigate their daily commute.

The urban design of Burnham SCG prioritizes green spaces and walkability. Urban planners have designed parks and pedestrian-friendly pathways that encourage outdoor activities and community engagement. These green areas not only enhance urban aesthetics but also contribute to improved air quality and biodiversity.

Lastly, community involvement stands at the core of Burnham SCG’s framework. The city regularly engages its residents through public forums and digital platforms, ensuring that their voices are heard in decision-making processes regarding urban development and sustainability initiatives.

In summary, Burnham SCG is a visionary model of a smart city that integrates technology, sustainability, and community engagement. With its innovative features and forward-thinking policies, it sets a benchmark for future urban developments around the world.