Burnham SCG manual Silicone Tubing Assembly, Main Burners and Firebox

Page 69

d.Remove wires to Flame Roll-out Switch.

e.Remove air diffuser screen.

f.Remove Burner Access Panel.

g.Mark location of Main Burner with Pilot Bracket on gas manifold.

h.Hold Main Burner on throat. Lift front of burners to clear orifice. Burner which holds pilot can be removed by lifting the burner adjacent to its right first.

2.Disconnect Vent Connector and Vent Pipe from Blower Outlet

3.Remove Jacket Top Panel.

4.Disconnect the Black and Gary Silicone Tubing from the Canopy.

5.Disconnect Wiring Harness from Blower Motor.

6.Remove Canopy/Blower Assembly.

a.Loosen the (4) screws from Canopy.

7.Remove Flue Gas Baffles. Inspect Flue Gas Baffles for deterioration.

8.Inspect flue passages. Clean with flue brush. See Figure 42.

9.Inspect heating surface in combustion chamber. Clean with straight handle wire brush.

10.Install Flue Gas Baffles.

11.Replace Canopy/Blower Assembly.

12.Connect Silicone Tubing between Pressure Fittings on Canopy Assembly and Pressure Switch. Route through bushings in Vestibule Panel . See Figure 40.

Figure 40: Silicone Tubing Assembly

Figure 41: Blower Vent Connector Assembly

13.Install Jacket Top Rear Panel.

14.Connect Vent System. See Figure 41.

15.Connect Blower Motor Wiring Harness.

E.Main Burners and Firebox.

1. Vacuum firebox. Exercise care - do not damage base insulation.

2. Clean main burners. Brush top of burners with soft bristle brush. See Figure 42. Vacuum to remove any dirt and lint.

3. Vacuum tip of pilot burner.

4. Check gas orifices for lint and dirt. Clean as necessary.

5. Install main burners by reversing procedure to remove burners.

a.Pilot burner must be installed in original location. See Table 11.

b.Main burners must be properly secured in burner tray slot at rear of firebox and over gas orifice. See Figure 42.

c.Pilot gas supply and pilot lead wires must be reconnected.

d.Burner access panel must be securely in place.

e.Reinstall air diffuser screen.

f.Reconnect Flame Roll-out wires.

g.Air Intake Box Front Door must be installed.

F.Check operation. Follow steps G through P from Section VIII: System Start-up.

69

Image 69
Contents SCG Important Information Read Carefully Page Table of Contents Dimensions Installation must conform to the requirements Pre-InstallationAppliance is design certified for installation on Provide combustion and ventilation air in accordanceDo not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerSee Section III. Venting / Air Intake PipingVent System Components Part Number General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Install Air Intake Piping. See Figures 10 Combination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 SCG-5 & SCG-6 General Installation Requirements Pre-Installation ConsiderationsPage Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air 3 or 4 Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim How to Test How to WireSupply Water Manifold Piping Page Page Gravity Factor Gas PipingRecommended Gas Piping Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page VII. Modular Installation Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Sequence of Operation Check limit Adjust gas input rate to boilerLow water cutoff if so equipped IX. ServiceMain Burners and Firebox Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Pilot Burner Location Procedure for Measuring Differential Pressure See FigurePage Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty

SCG specifications

Burnham SCG, short for Burnham Smart City Grid, represents a groundbreaking initiative aimed at reshaping urban landscapes through the integration of modern technologies and sustainable practices. Situated in the heart of a growing metropolis, Burnham SCG embodies the principles of smart city design, focusing on creating an efficient, interconnected environment that enhances the quality of life for its residents.

One of the key features of Burnham SCG is its extensive use of Internet of Things (IoT) technology. This infrastructure enables real-time data collection from various sensors strategically placed throughout the city. For instance, smart streetlights equipped with sensors adjust their brightness based on ambient light conditions and pedestrian activity, effectively reducing energy consumption. This use of IoT extends to waste management, where smart bins signal when they are full, optimizing collection routes and minimizing fuel consumption.

In addition to IoT, Burnham SCG places a strong emphasis on renewable energy sources. The city integrates solar panels across public buildings and utilizes wind turbines in designated areas, contributing to a significant reduction in carbon emissions. Furthermore, an advanced battery storage system ensures that excess energy generated during peak production times is efficiently stored and used during high-demand periods, promoting energy resilience.

Transportation in Burnham SCG embraces the future with integrated smart mobility solutions. A robust network of electric vehicle charging stations encourages the adoption of eco-friendly transportation. The city also features a user-friendly app that provides real-time information about public transport schedules, bike-sharing availability, and traffic conditions, making it easier for residents to navigate their daily commute.

The urban design of Burnham SCG prioritizes green spaces and walkability. Urban planners have designed parks and pedestrian-friendly pathways that encourage outdoor activities and community engagement. These green areas not only enhance urban aesthetics but also contribute to improved air quality and biodiversity.

Lastly, community involvement stands at the core of Burnham SCG’s framework. The city regularly engages its residents through public forums and digital platforms, ensuring that their voices are heard in decision-making processes regarding urban development and sustainability initiatives.

In summary, Burnham SCG is a visionary model of a smart city that integrates technology, sustainability, and community engagement. With its innovative features and forward-thinking policies, it sets a benchmark for future urban developments around the world.