Burnham SCG manual Base Assembly

Page 77

Key

 

 

 

 

 

[Quantity] Part Number

 

 

Description

 

 

 

 

 

 

 

 

 

 

 

No.

SCG-3

 

SCG-4

 

SCG-5

 

SCG-6

 

SCG-7

SCG-8

SCG-9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. BASE ASSEMBLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2A

Base Wrapper

71807031

 

71807041

 

71807051

 

71807061

 

71807071

71807081

71807091

 

 

 

 

 

 

 

 

 

 

 

 

 

2B

Base Tray

71807032

 

71807042

 

71807052

 

71807062

 

71807072

71807082

71807092

 

 

 

 

 

 

 

 

 

 

 

 

 

2C

Burner Tray Assembly

61807031

 

61807041

 

61807051

 

61807061

 

61807071

61807081

61807091

 

 

 

 

 

 

 

 

 

 

 

 

 

2D

Base Front Panel

71807035

 

71807045

 

71807055

 

71807065

 

71807075

71807085

71807095

 

 

 

 

 

 

 

 

 

 

 

 

 

2E

Burner Access Panel

71807036

 

71807046

 

71807056

 

71807066

 

71807076

71807086

71807096

 

 

 

 

 

 

 

 

 

 

 

 

 

2F

Cerafelt Gasket 1/2" x 2"

 

 

 

 

 

6206002

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2G

Cerafelt Gasket 1/2" x 2"

 

 

 

 

 

6206002

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2H

Base Side Insulation

 

 

 

 

 

(2) 72007001

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2J

Base Rear Insulation

72007031

 

72007041

 

72007051

 

72007061

 

72007071

72007081

72007091

 

 

 

 

 

 

 

 

 

 

 

 

 

2K

Base Front Insulation

72007032

 

72007042

 

72007052

 

72007062

 

72007072

72007082

72007092

 

 

 

 

 

 

 

 

 

 

 

 

 

2L

Base Leg Assembly

 

 

 

 

 

(4) 6186001

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2M

Self Tapping Screw, 1/4"-20 x 1/2"

 

 

 

 

 

(18) 80860700

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2N

Flame Roll-out Switch

 

 

 

 

 

80160044

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2P

Sheet Metal Screw, #8 x 3/4"

 

 

 

 

 

80860030

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2Q

Self Tapping Screw, 10-32 x 3/8"

 

(5) 80860705

 

 

(6) 8086070

(7) 8086070

 

 

 

 

 

 

 

 

 

 

 

 

 

2R

Seft Tapping Screw Hex Cap,

 

 

 

 

 

(4) 80860717

 

 

 

5/16 -18 x 3/4"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

77

Image 77
Contents SCG Important Information Read Carefully Page Table of Contents Dimensions Installation must conform to the requirements Pre-InstallationAppliance is design certified for installation on Provide combustion and ventilation air in accordanceDo not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerSee Section III. Venting / Air Intake PipingVent System Components Part Number General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Install Air Intake Piping. See Figures 10 Combination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 SCG-5 & SCG-6 General Installation Requirements Pre-Installation ConsiderationsPage Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air 3 or 4 Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim How to Test How to WireSupply Water Manifold Piping Page Page Gravity Factor Gas PipingRecommended Gas Piping Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page VII. Modular Installation Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Sequence of Operation Check limit Adjust gas input rate to boilerLow water cutoff if so equipped IX. ServiceMain Burners and Firebox Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Pilot Burner Location Procedure for Measuring Differential Pressure See FigurePage Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty

SCG specifications

Burnham SCG, short for Burnham Smart City Grid, represents a groundbreaking initiative aimed at reshaping urban landscapes through the integration of modern technologies and sustainable practices. Situated in the heart of a growing metropolis, Burnham SCG embodies the principles of smart city design, focusing on creating an efficient, interconnected environment that enhances the quality of life for its residents.

One of the key features of Burnham SCG is its extensive use of Internet of Things (IoT) technology. This infrastructure enables real-time data collection from various sensors strategically placed throughout the city. For instance, smart streetlights equipped with sensors adjust their brightness based on ambient light conditions and pedestrian activity, effectively reducing energy consumption. This use of IoT extends to waste management, where smart bins signal when they are full, optimizing collection routes and minimizing fuel consumption.

In addition to IoT, Burnham SCG places a strong emphasis on renewable energy sources. The city integrates solar panels across public buildings and utilizes wind turbines in designated areas, contributing to a significant reduction in carbon emissions. Furthermore, an advanced battery storage system ensures that excess energy generated during peak production times is efficiently stored and used during high-demand periods, promoting energy resilience.

Transportation in Burnham SCG embraces the future with integrated smart mobility solutions. A robust network of electric vehicle charging stations encourages the adoption of eco-friendly transportation. The city also features a user-friendly app that provides real-time information about public transport schedules, bike-sharing availability, and traffic conditions, making it easier for residents to navigate their daily commute.

The urban design of Burnham SCG prioritizes green spaces and walkability. Urban planners have designed parks and pedestrian-friendly pathways that encourage outdoor activities and community engagement. These green areas not only enhance urban aesthetics but also contribute to improved air quality and biodiversity.

Lastly, community involvement stands at the core of Burnham SCG’s framework. The city regularly engages its residents through public forums and digital platforms, ensuring that their voices are heard in decision-making processes regarding urban development and sustainability initiatives.

In summary, Burnham SCG is a visionary model of a smart city that integrates technology, sustainability, and community engagement. With its innovative features and forward-thinking policies, it sets a benchmark for future urban developments around the world.