This boiler uses flammable gas, high voltage electricity, moving parts, and very hot water under high pressure. Assure that all gas and electric power supplies are off and that the water temperature is cool before attempting any disassembly or service.

Assure that all gas valves and electrical disconnect switches are off before attempting any disassembly or service.

Do not attempt any service work if gas is present in the air in the vicinity of the boiler. Never modify, remove or tamper with any control device.

WARNING

This boiler must only be serviced and repaired by skilled and experienced service technicians.

If any controls are replaced, they must be replaced with identical models.

Read, understand and follow all the instructions and warnings contained in all the sections of this manual.

If any electrical wires are disconnected during service, clearly label the wires and assure that the wires are reconnected properly.

Never jump out or bypass any safety or operating control or component of this boiler.

Read, understand and follow all the instructions and warnings contained in ALL of the component instruction manuals.

Assure that all safety and operating controls and components are operating properly before placing the boiler back in service.

A.General. Inspection and service should be conducted annually. Turn off electrical power and gas supply while conducting service or maintenance. Follow instructions TO TURN OFF GAS TO APPLIANCE. See Figure 37.

B.Low water cutoff (if so equipped).

Probe Type (Annual Service). Probe type LWCO should be removed once a year, examined and cleaned of any dirt accumulations to assure proper operations. Do not attempt to repair mechanisms in the field. Complete replacement mechanisms, including necessary gaskets and installation instructions, are available from the manufacturer.

C.Vent/Air Intake System. Inspect for obstructions, soot accumulation, proper support, and deterioration of pipe, fittings, and joints.

1.Clean terminal screens. Terminals must be free of obstruction, undamaged, with screens securely in place.

2.Terminal and wall thimbles (if used) must be weathertight.

3.Pipe must be full round shape, and show no damage from impact or excessive temperature.

4.Pipe must be supported at minimum five (5) foot intervals and must not sag.

5.All vent joints must be secure and watertight.

6.All air intake joints must be secure and airtight. Horizontal vent tee drain or vertical vent tee drain (if used) must have minimum 6 inch trap and allow condensate to flow freely. To Clean:

a.Disconnect drain tube from drain fitting.

b.Flush drain tube with water. Fill trap with water.

c.Securely fasten drain tube to drain fitting, providing gas-tight and watertight seal.

7.If pipe must be disassembled for removal of obstructions or resealing of joint, see Section III, Paragraph C.

D.Boiler Flue Passages. Inspect for blockage or soot accumulation.

1.Remove Main Burners. See Figure 42.

a.Remove front door.

b.Remove air intake box front door. i. Remove sheet metal screws.

c.Disconnect pilot tubing and pilot lead wires at the gas valve.

68

Image 68
Contents SCG Important Information Read Carefully Page Table of Contents Dimensions Pre-Installation Installation must conform to the requirementsAppliance is design certified for installation on Provide combustion and ventilation air in accordanceII. Unpack Boiler Do not drop boiler. Do not bump boiler jacket against floorIII. Venting / Air Intake Piping See SectionVent System Components Part Number Vent Guidelines Due to Removal of an Existing Boiler General GuidelinesInstall Vent Pipe, Burnham Gasketed Vent System Burnham Gasketed Vent Joint DetailVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Install Air Intake Piping. See Figures 10 Combination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 SCG-5 & SCG-6 Pre-Installation Considerations General Installation RequirementsPage Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Fire Stop/Wall Thimble/Support, SC FS Tall Cone Flashing Directly On Roof or CurbPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air 3 or 4 Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim How to Wire How to TestSupply Water Manifold Piping Page Page Gas Piping Gravity FactorRecommended Gas Piping Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page VII. Modular Installation Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Sequence of Operation Adjust gas input rate to boiler Check limitIX. Service Low water cutoff if so equippedSilicone Tubing Assembly Main Burners and FireboxFlue and Burner Cleanout, 1 Burner Procedure for Measuring Differential Pressure See Figure Pilot Burner LocationPage Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty

SCG specifications

Burnham SCG, short for Burnham Smart City Grid, represents a groundbreaking initiative aimed at reshaping urban landscapes through the integration of modern technologies and sustainable practices. Situated in the heart of a growing metropolis, Burnham SCG embodies the principles of smart city design, focusing on creating an efficient, interconnected environment that enhances the quality of life for its residents.

One of the key features of Burnham SCG is its extensive use of Internet of Things (IoT) technology. This infrastructure enables real-time data collection from various sensors strategically placed throughout the city. For instance, smart streetlights equipped with sensors adjust their brightness based on ambient light conditions and pedestrian activity, effectively reducing energy consumption. This use of IoT extends to waste management, where smart bins signal when they are full, optimizing collection routes and minimizing fuel consumption.

In addition to IoT, Burnham SCG places a strong emphasis on renewable energy sources. The city integrates solar panels across public buildings and utilizes wind turbines in designated areas, contributing to a significant reduction in carbon emissions. Furthermore, an advanced battery storage system ensures that excess energy generated during peak production times is efficiently stored and used during high-demand periods, promoting energy resilience.

Transportation in Burnham SCG embraces the future with integrated smart mobility solutions. A robust network of electric vehicle charging stations encourages the adoption of eco-friendly transportation. The city also features a user-friendly app that provides real-time information about public transport schedules, bike-sharing availability, and traffic conditions, making it easier for residents to navigate their daily commute.

The urban design of Burnham SCG prioritizes green spaces and walkability. Urban planners have designed parks and pedestrian-friendly pathways that encourage outdoor activities and community engagement. These green areas not only enhance urban aesthetics but also contribute to improved air quality and biodiversity.

Lastly, community involvement stands at the core of Burnham SCG’s framework. The city regularly engages its residents through public forums and digital platforms, ensuring that their voices are heard in decision-making processes regarding urban development and sustainability initiatives.

In summary, Burnham SCG is a visionary model of a smart city that integrates technology, sustainability, and community engagement. With its innovative features and forward-thinking policies, it sets a benchmark for future urban developments around the world.