Figure 12.4: Outdoor Reset Curve

7)The sequence of operation for a BWC series boiler on a call for heat from a thermostat is as described below:

a)When power is first turned on, 120V is provided to the MCBA, the combustion fan and the LWCO trans- former. A separate 50VA transformer, connected directly to the MCBA, powers all other low voltage circuits.

b)For the first few seconds after power-up the control module goes through a self check.

c)When there is a call for heat, the control module checks to make sure the air pressure switch is open. If it is, the combustion fan will be energized and will ramp up to ignition speed. When the air pressure switch closes, a 10 second prepurge is activated.

d)After the prepurge, the control module energizes the gas control valve and the spark for 4.5 seconds. If a

flame is established and proved, the control allows the flame to stabilize for 5 seconds at the combustion fan ignition speed setting. If the flame fails to prove, the control module will attempt to light the burner 4 more times. If a flame is still not established, the control will lockout.

e)Once the flame stabilization period has ended, the MCBA allows the burner to modulate. The actual firing rate is dependent upon the measured current and recent differences between the set point temperature and the supply temperature. If an outdoor sensor is connected to the control module and the boiler is responding to a call for heat, the set point temperature will be determined by the outdoor reset curve shown in Figure 12.4.

f)Once the set point temperature is reached, the MCBA will turn the burner off and allow the combustion fan to operate in postpurge for 35 seconds before it turns off.

g)The central heating pump will continue to operate until the room thermostat has been satisfied.

h)A demand for domestic hot water (DHW) is given priority on BWC series boilers. If a call for DHW is received while the boiler is responding to a call for heat, the heating circulator is deenergized until the call for DHW is satisfied.

67

Image 69
Contents Page Page III Page III Before Installing Page Clearances From Vent Piping To Combustible Construction Page Page Page VI Air for Ventilation Page VII Venting Page Summary of Horizontal Venting Options Page Vent Option Manufacturer Vent Size Component Part Number Page Snorkel Terminal Configuration VENT/ AIR Intake Fitting Equivalent Length 10 Vertical Twin Pipe Vent System Vent Option Removing an Existing Boiler From a Common Chimney Page Page Page Page 30a Cuttable Straight Section Page Page Page Page Page Page Page Page Page 47 CORR/GUARD Connection to Vent Collar 48 Z-VENT III Connection to Vent Collar 49 SAF-T Vent EZ Seal Connection to Vent Collar Page Condensate Trap and Drain Line Page Page IX System Piping Page Page Page Page Pipe and Circulator Sizing for Indirect Water Heater Loop Page Boiler Head Loss Piping for Special Situations Page Wiring Page Page Page XI Start-up and Checkout Page For Your Safety Read Before Lighting Page Page Page Page Page Page Page Outdoor Reset Curve XIII. Service and Maintenance Page Page Soft Lockout Codes Displayed Page XV Parts Page Page Page Page