Crown Boiler BWC151 manual Boiler Head Loss

Page 52

 

19.00

 

 

 

 

 

 

 

 

 

 

 

 

 

18.00

 

 

 

 

 

 

 

 

 

 

 

 

 

17.00

 

 

 

 

 

 

 

 

 

 

 

 

 

16.00

 

 

 

 

 

 

 

BWC120

 

 

 

 

 

15.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14.00

 

 

 

BWC070, BWC090

 

 

 

 

 

 

 

 

 

13.00

 

 

 

 

 

 

 

 

 

 

 

 

 

12.00

 

 

 

 

 

 

 

 

 

BWC151

 

 

wc)

 

 

 

 

 

 

 

 

 

 

 

 

11.00

 

 

 

 

 

 

 

 

 

 

 

 

(ft

10.00

 

 

 

 

 

 

 

 

 

 

 

 

Loss

 

 

 

 

 

 

 

 

 

 

 

 

9.00

 

 

 

 

 

 

 

 

 

 

 

 

Head

8.00

 

 

 

 

 

 

 

 

 

 

 

 

7.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.00

 

 

 

 

 

 

 

 

 

 

 

 

 

5.00

 

 

 

 

 

 

 

 

 

 

 

 

 

4.00

 

 

 

 

 

 

 

 

 

 

 

 

 

3.00

 

 

 

 

 

 

 

 

 

 

 

 

 

2.00

 

 

 

 

 

 

 

 

 

 

 

 

 

1.00

 

 

 

 

 

 

 

 

 

 

 

 

 

0.00

 

 

 

 

 

 

 

 

 

 

 

 

 

4

5

6

7

8

9

10

11

12

13

14

15

16

Figure 9.9: Boiler Head Loss

FLOW (GPM)

C: Standard Piping Installation Requirements

Observe the following guidelines when making the actual installation of the boiler piping:

1)The relief valve is packaged loose with the boiler and must be installed in the location shown in Figure 2.1. The relief valve is set to open at 30 psi. If the valve is replaced, the replacement must have a relief capacity in excess of the DOE heating capacity for the boiler. Pipe the discharge of the relief valve to a location where water or steam will not create a hazard or cause property damage if the valve opens. The end of the discharge pipe must terminate in an unthreaded pipe. If the relief valve discharge is not piped to a drain, it must terminate at least 6 inches above the floor. Do not run relief valve discharge piping through an area that is prone to freezing. The termination of the relief valve discharge piping must be in an area where it is not likely to become plugged by debris.

DANGER









PIPE RELIEF VALVE DISCHARGE TO A SAFE LOCATION.

DO NOT INSTALL A VALVE IN THE RELIEF VALVE DISCHARGE LINE.

DO NOT INSTALL RELIEF VALVE IN A LOCATION OTHER THAN THAT SPECIFIED BY THE FACTORY.

DO NOT PLUG THE RELIEF VALVE DISCHARGE.

50

Image 52
Contents Page Page III Page III Before Installing Page Clearances From Vent Piping To Combustible Construction Page Page Page VI Air for Ventilation Page VII Venting Page Summary of Horizontal Venting Options Page Vent Option Manufacturer Vent Size Component Part Number Page Snorkel Terminal Configuration VENT/ AIR Intake Fitting Equivalent Length 10 Vertical Twin Pipe Vent System Vent Option Removing an Existing Boiler From a Common Chimney Page Page Page Page 30a Cuttable Straight Section Page Page Page Page Page Page Page Page Page 47 CORR/GUARD Connection to Vent Collar 48 Z-VENT III Connection to Vent Collar 49 SAF-T Vent EZ Seal Connection to Vent Collar Page Condensate Trap and Drain Line Page Page IX System Piping Page Page Page Page Pipe and Circulator Sizing for Indirect Water Heater Loop Page Boiler Head Loss Piping for Special Situations Page Wiring Page Page Page XI Start-up and Checkout Page For Your Safety Read Before Lighting Page Page Page Page Page Page Page Outdoor Reset Curve XIII. Service and Maintenance Page Page Soft Lockout Codes Displayed Page XV Parts Page Page Page Page