5)Assembly of Heat Fab
a)
•These instructions cover the installation of
•In general,
•Orient
•Support horizontal piping sections at intervals of 6 feet or less.
•Vertical venting systems must be supported by at least one Heat Fab support. An additional vertical support is required after any offset.
b)Connection to Boiler – Start assembly of the vent system at the boiler. Remove the hose clamp shipped on the BWC vent collar. Bend the three hose clamp tabs on this collar outward slightly. Cut the “male spigot” off of the first piece of pipe (Fig 7.49). If necessary, crimp the cut end of the pipe so that it can be inserted at least 1” into the collar. Clean the exterior of the male end of the first piece of pipe and the inside of the vent collar on the boiler with an alcohol pad. On the male end of the pipe, apply a ¼” wide bead of high temperature silicone approximately ½ inch from the male end of the pipe. Also apply a ¼” bead of silicone along the first 2 ½” of the longitudinal weld. Insert the male end of the pipe into the boiler vent collar until it bottoms out. Apply an additional bead of silicone over the outside of the joint and smooth out (Fig 7.49). Replace and tighten the clamp on the vent collar.
c)Assembly of
FIGURE 7.49: SAF-T VENT EZ SEAL CONNECTION TO VENT COLLAR
38