9)Pitch of Horizontal Piping - Pitch all horizontal piping so that any condensate which forms in the piping will run towards the boiler:

Pitch Crown horizontal concentric venting 5/8” per foot

Pitch Stainless steel venting 1/4” per foot.

10)Supporting Pipe - Vertical and horizontal sections of pipe must be properly supported:

Support Crown concentric venting near the female end of each straight section of pipe.

Exception: Vertical runs of concentric pipe in an unused chinmey (Figure 7.36) need only be supported at the terminal and at the base of the run.

• Support stainless steel venting as called for by the vent manufacturer’s instructions.

FIGURE 7.7: SNORKEL TERMINAL CONFIGURATION

18

Image 20
Contents Page Page III Page III Before Installing Page Clearances From Vent Piping To Combustible Construction Page Page Page VI Air for Ventilation Page VII Venting Page Summary of Horizontal Venting Options Page Vent Option Manufacturer Vent Size Component Part Number Page Snorkel Terminal Configuration VENT/ AIR Intake Fitting Equivalent Length 10 Vertical Twin Pipe Vent System Vent Option Removing an Existing Boiler From a Common Chimney Page Page Page Page 30a Cuttable Straight Section Page Page Page Page Page Page Page Page Page 47 CORR/GUARD Connection to Vent Collar 48 Z-VENT III Connection to Vent Collar 49 SAF-T Vent EZ Seal Connection to Vent Collar Page Condensate Trap and Drain Line Page Page IX System Piping Page Page Page Page Pipe and Circulator Sizing for Indirect Water Heater Loop Page Boiler Head Loss Piping for Special Situations Page Wiring Page Page Page XI Start-up and Checkout Page For Your Safety Read Before Lighting Page Page Page Page Page Page Page Outdoor Reset Curve XIII. Service and Maintenance Page Page Soft Lockout Codes Displayed Page XV Parts Page Page Page Page