B. Removing an Existing Boiler From a Common Chimney

Read this only if the BWC boiler is replacing an existing boiler that is being removed from a common chimney. This section does not apply to the installation of a BWC boiler.

In some cases, when an existing boiler is removed from a common chimney, the common venting system may be too large for the remaining appliances. At the time of removal of an existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.

(a)Seal any unused openings in the common venting system.

(b)Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.

(c)Insofar as practical, close all building doors and windows and all doors between the space in which all the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.

(d)Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so the appliance will operate continuously.

(e)Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar, or pipe.

(f)After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas-burning appliances to their previous condition of use.

(g)Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1. When re-sizing any portion of the common venting system, the common venting system should be re sized to approach the minimum size as determined using the appropriate tables in Part 11 of the National Fuel Gas Code, ANSI Z223.1.

WARNING

NEVER COMMON VENT A BWC BOILER WITH OTHER APPLIANCES.

21

Image 23
Contents Page Page III Page III Before Installing Page Clearances From Vent Piping To Combustible Construction Page Page Page VI Air for Ventilation Page VII Venting Page Summary of Horizontal Venting Options Page Vent Option Manufacturer Vent Size Component Part Number Page Snorkel Terminal Configuration VENT/ AIR Intake Fitting Equivalent Length 10 Vertical Twin Pipe Vent System Vent Option Removing an Existing Boiler From a Common Chimney Page Page Page Page 30a Cuttable Straight Section Page Page Page Page Page Page Page Page Page 47 CORR/GUARD Connection to Vent Collar 48 Z-VENT III Connection to Vent Collar 49 SAF-T Vent EZ Seal Connection to Vent Collar Page Condensate Trap and Drain Line Page Page IX System Piping Page Page Page Page Pipe and Circulator Sizing for Indirect Water Heater Loop Page Boiler Head Loss Piping for Special Situations Page Wiring Page Page Page XI Start-up and Checkout Page For Your Safety Read Before Lighting Page Page Page Page Page Page Page Outdoor Reset Curve XIII. Service and Maintenance Page Page Soft Lockout Codes Displayed Page XV Parts Page Page Page Page