A.O. Smith 2500, 200, 201, 2100 Standard Vent Vertical Category, Type B or, Equivalent, 16 40.6 cm

Page 10

STANDARD VENT - VERTICAL (CATEGORY I)

IMPORTANT!

VENT PRESSURE MUST BE MAINTAINED BETWEEN -0.02" W.C. AND -0.04" W.C. AT 24" (61.0 cm) ABOVE BOILER COLLAR.

Figure 5.

TABLE 7. STANDARD VERTICAL VENTING (CATEGORY I)

 

APPLIANCE

CERTIFIED

EXHAUST

MAXIMUM LENGTH WITHOUT

MODEL

CATEGORY

VENTING

VENT SIZE

BAROMETRIC DAMPER (FEET)

 

 

MATERIAL

(INCHES)

 

I000

I

TYPE B OR

10”(25.4 cm)

35 Feet (10.7 m) without damper

EQUIVALENT

 

*70 Feet (21.3 m) max. with damper

 

 

 

1300

I

TYPE B OR

 

35 Feet (10.7 m) without damper

1500

EQUIVALENT

12" (30.5 cm)

*70 Feet (21.3 m) max. with damper

 

1850

I

TYPE B OR

14"(35.6 cm)

35 Feet (10.7 m) without damper

2100

EQUIVALENT

 

*70 Feet (21.3 m) max. with damper

 

 

2500

I

TYPE B OR

16" (40.6 cm)

35 Feet (10.7 m) without damper

EQUIVALENT

 

*70 Feet (21.3 m) max. with damper

 

 

 

*Extending venting over 70 feet (21.3 m) may require special considerations.

Connection for the appliance exhaust vent to the stack must be as direct as possible. Maximum and minimum venting length for Category I appliances shall be determined per the latest edition of the National Fuel Code (U.S.) and CAN/CSA-B149.1 and .2 Installation Code (Canada).

The horizontal breaching of a vent must have an upward slope of not less than 1/4 inch per linear foot (2 cm/m) from the boiler to the vent terminal. The horizontal portion of the vent shall be supported to maintain clearances and to prevent physical damage or separation of joints.

10

Image 10
Contents For buying this cost efficient, high recovery unit from Limited WarrantyGAS and Electrical Characteristics ROUGH-IN DimensionsRough in Dimensions Recovery Capacities Heat Exchanger Pressure DropGrounding Instructions High Altitude InstallationForeword Correct GASFEATURES/CONTROLS Circulating Pump Installation InstructionsSafety Relief Valves Required Ability Levelling Installation Clearances Chemical Vapor Corrosion AIR RequirementsUnconfined Space Connecting Boiler to a Common VentVenting Confined SpaceIntake/Exhaust Installation Requirements See figure Location Requirements INTAKE/EXHAUSTEquivalent Standard Vent Vertical CategoryType B or 16 40.6 cmIII Stainless Standard Vent Horizontal CategoryVenting Vent Size Vent Length Material Inches Feet SteelDirect Vent Vertical Exhaust Configurations Direct Vent Vertical CategoryDirect Vent Horizontal Exhaust Configurations Direct Vent Horizontal CategoryStandard Vertical VENTING, Category Horizontal Vent InstallationVent Connector Model Number Standard Horizontal VENTING, CategorySystem Installation Hydronic InstallationCooling Piping Space Heating ApplicationsHOT Water Supply Boiler Installation Single boiler with horizontal tank Single boiler with vertical tank Suggested Pipe Size For Multiple Gas Appliances Propane Gas Distance from Meter BTU Input Single Unit INSTALLATION, Suggested Pipe SizeGAS Connections BtuhFilling for HOT Water Supply Boiler Installation Wiring ConnectionsFilling and Purging for Heating Boiler Installation OperationInlet GAS Pressure AdjustmentsPurging of GAS Line Manifold PressureFor Your Safety Read Before Operating For Your Safety Read Before Operating Control System DIA-SCAN II Display Board Operating ProceduresDescription of MULTI-STAGE Firing System Red Fault Lights Options/Features Setting ProceduresGreen Status Lights Outlet Probe Temperature ProbesYellow Parameter Set Lights Inlet ProbeApplication Hydronic Heating Procedure for Setting Tank Probe TemperatureProcedure for Setting Stage Differential Stage OneDisplay Stage Cycle Count Procedure for Setting Pump DelayLast Error Mode Appliance Operating SequencePreventative Maintenance Main BurnersDeliming Troubleshooting Ignition System Replacement PartsLED Insufficient AIR AIR Pressure Switch Stage No GAS Valve Power SensedCirculate Fault Flow Switch Power VentNEW Boiler Limited Warranty Replacement Parts