A.O. Smith 2100, 200, 201, 2500, 1850, 1300, 1500 Recovery Capacities, Heat Exchanger Pressure Drop

Page 3

TABLE 3: RECOVERY CAPACITIES

 

 

 

 

Temperature Rise - Degrees °F (°C)

 

 

 

 

 

Input Rating

Gal/Liter

40°F

50°F

60°F

70°F

80°F

90°F

100°F

110°F

120°F

130°F

MODEL

BTU/Hr. (kW)

per Hr.

(22.2°)

(27.7°)

(33.3°)

(38.8°)

(44.4°)

(50°)

(55.5°)

(61.1°)

(66.7°)

(72.2°)

GW - 1000

990,000 (290.1)

LPH

9526

7620

6350

5443

4763

4234

3810

3462

3175

2930

 

 

GPH

2520

2016

1680

1440

1260

1120

1008

916

840

775

GW - 1300

1,300,000 (380.9)

LPH

12508

10006

8339

7148

6256

5560

5005

4547

4169

3848

 

 

GPH

3309

2647

2206

1891

1655

1471

1324

1203

1103

1018

GW - 1500

1,500,000 (439.5)

LPH

14432

11548

9620

8248

7216

6415

5772

5247

4812

4442

 

 

GPH

3818

3055

2545

2182

1909

1697

1527

1388

1273

1175

GW - 1850

1,850,000 (542.0)

LPH

17800

14239

11865

10172

8902

7912

7122

6471

5935

5477

 

 

GPH

4709

3767

3139

2691

2355

2093

1884

1712

1570

1449

GW - 2100

2,100,000 (615.3)

LPH

20204

16163

13472

11548

10104

8981

8082

7348

6736

6218

 

 

GPH

5345

4276

3564

3055

2673

2376

2138

1944

1782

1645

GW - 2500

2,490,000 (729.6)

LPH

23958

19168

15971

13691

11979

10648

9582

8713

7987

7371

 

 

GPH

6338

5071

4225

3622

3169

2817

2535

2305

2113

1950

TABLE 4: HEAT EXCHANGER PRESSURE DROP

GB Models-Flow, Head Loss and Temperature Rise

 

 

20 Deg. F Rise

30 Deg. F Rise

40 Deg. F Rise

Maximum Flow Rate

Minimum Flow Rate

 

 

GPM

PD-FT

GPM

PD-FT

GPM

PD-FT

GPM

PD-FT

Deg. F

GPM

PD-FT

Deg. F

MODEL

 

 

Head

 

Head

 

Head

 

Head

Rise

 

Head

 

Rise

GB - 1000

83.16

5.1

55.4

2.7

41.6

1.5

154

12.2

11

42

1.5

 

40

 

GB - 1300

109.2

7.2

72.8

4.2

54.6

3.2

154

14.5

14

55

3.2

 

40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GB - 1500

126

10.1

84

6.3

63

4.3

154

16.3

17

64

4.3

 

40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GB - 1850

154

18.5

103.6

10.1

77.7

6.4

154

18.5

20

78

6.4

 

40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GB - 2100

 

n/a

n/a

117.6

14.5

88.2

8.3

154

21.3

23

89

8.3

 

40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GB - 2500

 

n/a

n/a

139.4

18.5

104.6

11.6

154

23.2

28

105

11.6

 

40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: GW models (GB optional) are equipped with pumps capable of handling 50 equivalent feet

 

 

 

 

 

(15.2 m) of normal pipe fittings.

 

 

 

 

 

 

 

 

 

3

Image 3
Contents Limited Warranty For buying this cost efficient, high recovery unit fromROUGH-IN Dimensions GAS and Electrical CharacteristicsRough in Dimensions Heat Exchanger Pressure Drop Recovery CapacitiesCorrect GAS High Altitude InstallationForeword Grounding InstructionsFEATURES/CONTROLS Required Ability Installation InstructionsSafety Relief Valves Circulating PumpAIR Requirements Installation ClearancesChemical Vapor Corrosion LevellingConfined Space Connecting Boiler to a Common VentVenting Unconfined SpaceLocation Requirements INTAKE/EXHAUST Intake/Exhaust Installation Requirements See figure16 40.6 cm Standard Vent Vertical CategoryType B or EquivalentSteel Standard Vent Horizontal CategoryVenting Vent Size Vent Length Material Inches Feet III StainlessDirect Vent Vertical Category Direct Vent Vertical Exhaust ConfigurationsDirect Vent Horizontal Category Direct Vent Horizontal Exhaust ConfigurationsStandard Horizontal VENTING, Category Horizontal Vent InstallationVent Connector Model Number Standard Vertical VENTING, CategoryHydronic Installation System InstallationSpace Heating Applications Cooling PipingHOT Water Supply Boiler Installation Single boiler with horizontal tank Single boiler with vertical tank Suggested Pipe Size For Multiple Gas Appliances Propane Gas Btuh Single Unit INSTALLATION, Suggested Pipe SizeGAS Connections Distance from Meter BTU InputOperation Wiring ConnectionsFilling and Purging for Heating Boiler Installation Filling for HOT Water Supply Boiler InstallationManifold Pressure AdjustmentsPurging of GAS Line Inlet GAS PressureFor Your Safety Read Before Operating For Your Safety Read Before Operating DIA-SCAN II Display Board Operating Procedures Control SystemDescription of MULTI-STAGE Firing System Options/Features Setting Procedures Red Fault LightsGreen Status Lights Inlet Probe Temperature ProbesYellow Parameter Set Lights Outlet ProbeStage One Procedure for Setting Tank Probe TemperatureProcedure for Setting Stage Differential Application Hydronic HeatingAppliance Operating Sequence Procedure for Setting Pump DelayLast Error Mode Display Stage Cycle CountMain Burners Preventative MaintenanceDeliming Replacement Parts Troubleshooting Ignition SystemLED Power Vent No GAS Valve Power SensedCirculate Fault Flow Switch Insufficient AIR AIR Pressure Switch StageNEW Boiler Limited Warranty Replacement Parts