Jenn-Air W10323791 Ab C, Oven back Broil burner orifice Broil burner orifice hole

Page 17

3.Apply masking tape to the end of a 7 mm nut driver to help hold the gas orifice spud in the nut driver while changing it. Insert nut driver into the gas opening and press down onto the gas orifice spud and remove by turning the gas orifice spud counterclockwise and lifting out. Set gas orifice spud aside.

AB C

A.Oven back

B.Broil burner orifice

C.Broil burner orifice hole

4.Gas orifice studs are stamped with a letter and a number. Install the Number 97 oven broil burner orifice spud.

5.Place Natural gas orifice in plastic parts bag for future use and keep with package containing literature.

6.Replace the broil burner in the hole in the oven back, with the broil burner electrode inside the broil burner electrode hole, as illustrated.

3.Slide the bake burner cover to the right or left.

A

A. Bake burner cover

4.Lift up and remove oven bake burner cover and set aside.

5.Remove the oven bake burner screws and oven bake burner and gently set aside.

A

D

A

C B

A. Oven bake burner

B. Oven bake burner screws

C. Oven bake burner electrode bracket

D. Oven bake burner electrode

6. Lift up clip on the oven bake burner electrode bracket with a finger or flat-blade screwdriver

B

A

AB C

A. Broil burner orifice hole

B. Broil burner electrode

C. Broil burner electrode hole

7.Reinstall the oven broil burner screw. See Step 1 for illustration.

To Convert Oven Bake Burner (Left Oven Cavity on 48" [121.9 cm] models)

1.Remove oven racks.

2.Remove the oven door. See the “Oven Door” section in the Use and Care Guide.

A. Oven bake burner electrode bracket

B. Electrode bracket clip

17

Image 17 Contents
Installation Instructions Your safety and the safety of others are very important Range SafetyTools and Parts Installation RequirementsProduct Dimensions 30 76.2 cm models Mobile Home Additional Installation RequirementsMobile home installations require Location Requirements48 121.9 cm models Cabinet Dimensions18 45.7 cm upper cabinet to countertop ½ 3.8 cm J 7.6 cm K 12.7 cmGas Supply Requirements Electrical RequirementsType of Gas Natural GasGas Supply Line Gas Supply Pressure TestingGas Pressure Regulator Burner Input Rating AltitudeInstall Anti-Tip Bracket Installation InstructionsUnpack Range Measurement BMake Gas Connection Pipe thread Adapter Flexible connectorFloor Mounting Wall MountingVerify Anti-Tip Bracket Location Install GriddleLevel Range Complete ConnectionElectronic Ignition System Complete Installation Reinstall Kick PlateIf you need Assistance or Service Check Operation of Oven Bake Burners LP Gas Conversion GAS Conversions To Convert Gas Pressure Regulator To range Shutoff valve closed position Gas supply lineBake burner cover Gas Supply Pressure TestingOven baffle Oven baffle nuts Oven bake burner screws Oven bake burner electrode bracketGas orifice spud Oven bake burner electrode bracket Electrode bracket clipGrasp electrode here Bracket Broil burner screw Broil burner orifice hole Replace Oven Bake Burner CoverCover notches Shoulder screws Oven back Broil burner orifice Broil burner orifice hole AB CPull electrode out of bracket Burner orifice spud To Convert Surface BurnersComplete Installation Natural Gas Conversion Lift up and remove oven bake burner cover and set aside Pull electrode out of bracket Replace Oven Bake Burner Cover AB C Pull electrode out of bracket Size stamp Burner cap Burner headAtlas 15-pin Wiring DiagramsUser Interface UI HMI Keyboard 48 121.9 cm Oven Schematic for JGRP548 ModelStrip Circuits Burner Cooktop SchematicSW4 SW5 SW6 Votre sécurité et celle des autres est très importante Sécurité DE LA CuisinièreOutils et pièces Exigences DinstallationDimensions du produit Modèles de 30 76,2 cm Exigences d’emplacementModèles de 48 121,9 cm Modèles de 36 91,4 cm Dimensions du placard15 38,1 cm ½ 3,8 cm J 7,6 cm K 12,7 cmType de gaz Spécifications électriquesSpécifications de lalimentation en gaz Détendeur Canalisation de gazDébit thermique des brûleurs Altitude Test de pressurisation de la canalisation de gazInstallation de la bride antibasculement Instructions D’INSTALLATIONDéballage de la cuisinière Mesure BMontage au plancher Raccordement au gazMontage au mur Vis n 12 x 1⁵⁄₈ Bride antibasculementInstallation de la plaque à frire Vérification de lemplacement de la bride AntibasculementRéglage de laplomb de la cuisinière Achever le raccordementSystème dallumage électronique En affleurement avec le dessus de la cuisinière Réinstallation du garde-piedsConversion pour lalimentation au propane Achever l’installationConversions Pour Changement DE GAZ Détendeur Conversion du détendeurTest de pressurisation de la canalisation de gaz Couvercle du brûleur de cuisson au four Gicleur Saisir lélectrode ici SupportBrûleur de cuisson au four couvercle Réinstaller le couvercle du brûleur de cuisson au fourEncoches de couvercle Vis à épaulement AB C Dégager lélectrode du support Gicleur de brûleur Conversion des brûleurs de surfaceChapeau de brûleur Ouverture de gaz Base du brûleur Chapeau de brûleurAchever l’installation Conversion pour lalimentation au gaz naturel Déflecteur du four Écrous du déflecteur du four Lame plate puis retirer lélectrode Réinstaller le couvercle du brûleur de cuisson au four AB C Dégager lélectrode du support Réinstaller le couvercle du brûleur de cuisson au four Marquage pour identification de la taille Chapeau de brûleur Tête de brûleurRemarques Schémas de câblageInterface Utilisateur IU Schéma du four de 48 121,9 cm pour modèle JGRP548Schéma de la table de cuisson à 4 brûleurs Schémas des circuitsSchéma de la table de cuisson à 6 brûleurs 2010 10/10 All rights reserved