For Vertical Runs - One ceiling firestop is REQUIRED at the hole in each ceiling through which the vent passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the verti- cal vent component.

Mark the ceiling to establish the centerpoint of the vent.

Drill a hole or drive a nail through this centerpoint.

Check the floor above for any obstructions, such as wir- ing or plumbing runs.

Reposition the fireplace and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut an 11-inch X 11-inch (280mm X 280mm) hole through the ceiling, using the centerpoint previously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

11" (280 mm)

11" (280mm)

 

 

CHIMNEY

 

HOLE

NEW

EXISTING CEILING

JOISTS

FRAMING

 

MEMBERS

 

CEILING

 

Figure 17. 11" x 11" Hole & New Framing Members

If the area above the ceiling is NOT an attic, position and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 18. Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.

NOTE: Keep insulation away from the vent pipe at least 1 inch (25mm).

 

NAILS (4 REQUIRED)

 

RAFTER

CEILING

 

 

CEILING FIRESTOP

Figure 19.

Attic Firestop

19

Image 15
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents Certification High Altitude InstallationsInstallation Codes Appliance CertificationPre-install Preparation Introducing the Heat-N-Glo Gas FireplacesANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 7000XLS and 6000XLSB Space Requirements Clearance Requirements Fireplace Dimensions, LocationsLocating the Fireplace Framing the Fireplace32 156mm Vent System Components and Termination Kits Installing the Vent SystemIdentifying Vent Components Vent System ApprovalsVenting with ONE 1 90 Elbow Venting with three 90 elbows Venting with Three 3 90 Elbows Attach the First Vent Component to the Starting Collars Installing Vent ComponentsContinue Adding Vent Components To Install the Heat ShieldInstall Support Brackets To install support brackets for horizontal runs12 Hole and Vent Pipe Attic Firestop Ceiling Firestop Ceiling SidePointing UP Vent TerminationMinimum for vinyl clad soffits =VENT Terminal =AIR Supply InletMinimum Height from Roof to Lowest Discharge Opening Standing Pilot Ignition System Positioning, Leveling, and Securing the FireplaceGas Control System Securing of a FireplaceGas Supply Line Gas Pressure RequirementsTo Check for GAS Leaks Remote Wall Switch Wiring the FireplaceFor Standing Pilot Ignition Wiring Appliance Requirements Optional AccessoriesHearth Extensions FinishingCeramic Installing Trim, Logs, and Ember MaterialLighting the Fireplace After the InstallationDouble-check for faulty components Before Lighting the FireplaceImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace Maintenance