Heat & Glo LifeStyle GEM42 manual Facing Requirements, Important Installation Note

Page 26
Facing Requirements

Facing Requirements

Facing Thickness from 3/4” to 1-1/4”

Facing material within this thickness range can be brought to 1/2” behind the door top and sides. These non-combus- tible finishing materials must never overlap or obstruct the air outlet/inlet grille areas.

NON-COMBUSTIBLE

MATERIAL*

HEADER

52”

60”

*The fireplace requires a concrete board (or other non-combustible material) extending from the header to the floor and extending from fram- ing stud to framing stud. 52” HT x 60” WD

Figure 30.

IMPORTANT INSTALLATION NOTE:

Please note that there are four holes or dots on the tem- plate to assist in positioning the template. These holes or dots should line up with the door mounting holes on the unit to ensure proper placement of the door after finishing mate- rials are installed.

Facing Thickness greater than 1-1/4”

For facing material greater than 1-1/4” a template should be constructed to provided the finishers with a guide so as to leave a 1/8” gap between the finishing materials and the door. See Figure 31 to construct the facing template.

44.5”R

Ø3/8”

34.375”

27.970”

25.257”

3.625”

2.5”

2.5”

46.250”

Figure 31. Facing Template Dimensions

NON-COMBUSTIBLE

BOARD

FACING TEMPLATE

Figure 32. Position of board and template

26

Heat & Glo • GEM42 • 371-900 Rev. N • 2/05

Image 26
Contents GEM42 ModelInstallers Guide Underwriters Laboratories ListedREAD and UNDERSTAND all instructions carefully SAFETY AND WARNING INFORMATIONThis gas fireplace and vent assembly MUST be DO NOT USE this appliance if any part has beenService Parts Lists TABLE OF CONTENTSSafety and Warning Information Section 3 Installing the Fireplace5 Log set assembly Service PartsGEM42 NG, LP Exploded Parts DiagramACCESSORIES / ACCESSOIRES Service Parts List / Liste des pièces de rechangeGEM42 Valve Assembly Intermittent Pilot Ignition1Approvals and Codes Installation CodesHigh Altitude Installations Appliance CertificationIntroducing the Heat & Glo Gas Fireplaces Pre-install Preparation2Getting Started ANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE HAZARDFigure 1. Diagram of the GEM42 Heat & Glo GEM42 371-900 Rev. N 2/05Step 1. Locating the Fireplace 3Installing the FireplaceConstructing the Fireplace Chase Fireplace Dimensions, Locations47-1/2” Step 2. Framing the FireplaceFigure 3. Framing Dimensions 47-3/4”NOTE PIPES OVERLAP 1-1/4 INCHES AT EACH JOINT DVP90STTEMS OR COMPONENTS MAY BE USED Step 3. Installing the Vent SystemA. Vent System Approvals Identifying Vent ComponentsFlue Restrictor Instructions Pilot Shield AdjustmentSTRAIGHT UP VERTICAL VENTING V FT 40 MAX. 12.4 MELBOWS VENTING WITHTWO 2 90 o VENTING WITH ONE 1 90 ELBOWVENTING WITH THREE 3 90 ELBOWS V FTH FT H + H 1 FTVenting Out the Top Vent B. Installing Vent Components3. Install Support Brackets 1. Attach the First Vent Component to the Starting CollarsFigure 15. 10 x 12 Hole and Vent Pipe 4. Install FirestopsCut a 10-inch by 12-inch 254mm X 305mm hole through the wall Figure 16. Heat Shield, Interior & Exterior FirestopsWARNING THE TERMINATION CAP MUST BE C. Vent TerminationAttic Firestop POSITIONED SO THAT THE ARROW IS POINT- ING UPnot to be installed above a gas = AREA WHERE TERMINAL IS NOT PERMITTEDelectrical service meter/regulator assembly withinFigure 22. Minimum Height from Roof to Lowest Discharge Opening Step 4. Positioning, Leveling and Securing the FireplaceWARNING MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR Figure 23. Proper PositioningHeat-Zone Kit Step 5. Installing the Optional Heat-Out or Heat-Zone KitsHeat-Out Kit Step 6 The Gas Control SystemPressure Step 7. The Gas Supply LineStep 8. Gas Pressure Requirements Natural GasIntermittent Pilot Ignition IPI Wiring 3 Volt Transformer Step 9. Wiring the FireplaceFigure 26. Intermittent Pilot Ignition IPI Wiring Diagram Operation with Battery Back-upWARNING WHEN FINISHING THE FIREPLACE Step 10. FinishingFigure 27. Fan Wiring Diagram FINISH WALL MATERIALFigure 31. Facing Template Dimensions IMPORTANT INSTALLATION NOTEFacing Requirements Facing Thickness from 3/4” to 1-1/4”Figure 34. Glass Assembly Step 11. Installing Trim, Logs and Ember MaterialInstalling the Trim Glass Specifications GEM42 CERAMICStep 13. Lighting the Fireplace After the InstallationStep 12. Before Lighting the Fireplace Double-check for faulty componentsCleaning Flame Sensor Rod IPI Systems Frequency Annually Fireplace Maintenance4Maintaining and Servicing Your Fireplace Cleaning Glass Door