1. Bend tab to open.

Bottom Flange

Figure 7.2 Prepare Junction Box Bracket

2.Slide the flange of the junction box through the slot in the bracket.

Figure 7.3 Position Bracket on Junction Box

This tab should be bent back under the flange to help secure the bracket to the junction box.

Figure 7.4 Secure Bracket to Junction Box

Note: Do NOT wire 110

VAC to wall switch.

Figure 7.5 Attach the Heat Shield

Figure 7.6 Attach the Junction Box

C. Installation of Fan

Follow installation instructions supplied with fan kit.

CAUTION

Shock Risk

Do NOT remove grounding prong from plug.

Plug directly into properly grounded three- prong receptacle.

Route cord away from appliance.

Do NOT route cord under or in front of appliance.

Heat & Glo • EM-415/EM-415H • 31317 Rev Q • 10/06

25

Image 25
Contents Fire Risk Models EM-415 EM-415H Woodburning FireplaceGrate Listing Label Information/LocationNumber Table of Contents Appliance Certification Listing and Code ApprovalsNot intended for use as a primary heat source Getting Started Design and Installation ConsiderationsNegative Pressure Asphyxiation RiskMarginal Location Typical Fireplace System Typical Fireplace SystemInspect Fireplace and Components Tools and Supplies NeededFire Risk Explosion Risk Selecting Fireplace Location Framing and ClearancesClearances to Combustible Materials ClearancesFrame the Fireplace Sidewalls/SurroundsChimney Requirements ¨E. Construct the ChaseInstall the Outside Air Kit Installation of FireplaceFire Risk Sharp Edges Asphyxiation Risk Risk of Smoke SpillageFt min. from top of uppermost chimney section to air inlet Position the Fireplace Secure the FireplacePlace the Protective Metal Hearth Strips Level the FireplaceChimney Assembly Height of Chimney Components Degree SL306 SL312 SL318 SL324 SL336 SL348 Using Offsets/ReturnsAssemble the Chimney Sections Install the Ceiling FirestopsDouble-check the Chimney Assembly Install the Attic Insulation ShieldSecure the Chimney Chimney Termination Complete the EnclosureInstall the Chimney Air Kit required in Canada Install the Termination CapChase Top Installing an ST375 Square Termination Cap Junction Box Installation AccessoriesGas Log/Lighter Provisions Gas Code, Ansi Z223.1Shock Risk Installation of FanHearth Extension FinishingMantel Finishing MaterialGlass Doors Combustible MaterialGeneral Information Operating InstructionsClear Space Near the Fireplace Outside AirFlue Damper FirescreenWood Fuel GrateFirewood MoistureStarting a Fire Understanding Vent Problems TroubleshootingDiagnostic Questions Diagnostics and Problem SolvingSolutions Can’t get a good fire going. What am I doing wrong?fireplace burns the wood too fast. What can I do? Chimney Inspection/Cleaning Maintenance and Servicing the FireplaceDisposal of Ashes Firebox RefractoryWhen cleaning glass door Maintenance Task ListClean Chimney FireReference Materials Fireplace DimensionsCatalog # Description ¨ B. Fireplace ComponentsCatalog # Chimney Components14-1/2 1829 mm 10-7/8 276 mm 406 mm 508 mm Minimum Base Dimensions 26.5 X 28 with 34 X 34 with Minimum Base Dimensions 28 X 28 with 32 X 32 with 23 XTR442 TR442 / 444 TV 20 xEM-415 Series Service PartsHerringbone Brick Refractory option available week 03/04 Description of Part EM-415 EM-415H QtyThis page intentionally left blank Limited Warranty Warranty For Heat & GLO FireplacesContact Information