R
3100-I ACT WOOD INSERT
ZERO CLEARANCE ADJUSTABLE TRIM SUPPORT, 2” to 10”
Part No.
Included in Kit: (1) Trim Top, (1) Trim Front, (2) Trim Sides,
Tools Needed: Phillips Head Screwdriver, Sheet Metal Shears, Measuring Tape, Gloves
EXPLODED VIEW OF SCISSORS
1.The 10 screws on each set of scissors will already be loose when shipped. See Figure 14A.
2.Expand scissors to desired height. Tighten screws to hold in place using Phillips Head screwdriver. See
Figure 14B.
3.Measure front and side trims to required height to cover scissors and mark pieces for cutting. Cut excess mate- rial from top of trim’s edge, not bottom. This edge will be sharp; wear gloves to prevent injury to your hands.
See Figure 14B.
4.Using sheet metal shears, cut trim along the marked edge. The cut edge fits under lip of top trim, so it allows for some variance in your straight edge.
5.The
6.Place cut edge of trim under top lip and into position on scissors. Place side pieces on first and then front piece. The front piece overlaps side pieces. NOTE: The trim in the Flush Mount Kit is one piece.
7.Once you are satisfied with the positioning, remove trim and set aside.
8.Remove the paper from
9.There are 3 holes in the back flange of the top to secure it to the wall if necessary. Use the appropriate fastener for the type of wall material, i.e., brick, sheet- rock, etc.
NOTE: 3/8” ( 9.5mm) thick tile or like material can be cut to size and fit under lip of top trim edge for a decora- tive touch. See Figure 14C.
SCREWS ARE CIRCLED
| Figure 14A |
EXPAND SCISSORS TO DESIRED HEIGH T
CUT TOP EDGE OF TRIM,
INSTALL FRONT TRIM LAST. NOT BOTTOM EDGE CORNERS OVERLAP SIDE
TRIM PIECES
Figure 14B
Decorative tile may
be installed
Figure 14C
Figure 14D
Page 14 | September 1, 2008 |