Hearth and Home Technologies 6000GCF-IPIL Mantel and Wall Projections, Combustible Mantels

Page 20

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing or finishing material closer than the minimums listed must be constructed entirely of noncom- bustible materials (i.e., steel studs, concrete board, etc).

Combustible Mantels

 

 

 

18

Note: All

 

 

14-1/4

 

 

 

measurements

 

10-1/2

in inches.

 

6-3/4

 

 

 

 

3

 

 

 

 

11-1/4

 

 

 

10-1/8

 

 

 

9-1/2

 

 

7-1/4

8-3/8

 

 

 

 

 

MEASUREMENTS FROM TOP EDGE

 

 

OF HOOD OR TOP OF UNIT OPENING

Figure 5.3

Minimum Vertical and Maximum Horizontal

 

Dimensions of Combustibles

Combustible Mantel Legs or Wall Projections

 

 

 

 

 

1 in.

 

 

 

 

 

TOP VIEW

 

MIN.

 

 

 

 

 

 

 

 

 

 

3-1/2 in.

MIN. 3 ft. MAX.

Note: Clearance from fireplace opening to perpendicular wall.

Figure 5.4 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

20

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. H • 11/08

Image 20
Contents What to do if you smell gas HOT SurfacesXxxxxxxx CongratulationsHomeowner Reference Information Table of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationClearances Minimum Framing DimensionsConstructing the Appliance Chase Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Termination Locations Vent Termination Minimum Clearances= Area Where Terminal is not Permitted = Vent Terminal = AIR Supply InletVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination SLP series vent pipe, if desiredTop Vent Horizontal Termination Three Elbows Chart Break HereTop Vent Vertical Termination Two Elbows H1 Maximum V1 + MinimumHeat Shield Above First 900 Elbow Vent Clearances and FramingPipe Clearances to Combustibles Non-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Install the Ceiling Firestop Pipe DVPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Installing the Fiberglass Gasket Securing and Leveling the ApplianceInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall RF4-8 Apply Sealant TOP & Partial SidesInstall Vertical Termination Cap Heat Shield Requirements for Horizontal TerminationInstall Horizontal Termination Cap Ansi Z223.1 and CAN/CGA-B149 installation codesGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Intellifire Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Intellifire Pilot Ignition IPI Wiring DiagramJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Ember Material Install the RefractoryEmber Placement Install the Log Assembly Log #1 SRV2103-10712 Front View Install the Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP vent componentsDVP-TRAP DVP vent componentsDVP-HSM-B Not for use on these modelsDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Log Set Assembly Service PartsAt Depot Service Parts ListStocked 6000GCF-IPI Contact Information