Hearth and Home Technologies 6000GCF-IPI Assemble Slip Sections, Secure the Vent Sections

Page 35

B. Assemble Slip Sections

Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.6.

Slide together to the desired length.

Pilot hole

Figure 10.6 Slip Section Pilot Holes

Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.

Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.7.

Figure 10.7 Screws into Slip Section

Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”

NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length.

C. Secure the Vent Sections

Vertical runs must be supported every 8 ft. (2.44 m) after the 25 ft. (7.62 m) maximum unsupported rise.

Horizontal sections must be supported every 5 feet (1.52 m).

Vent supports or plumbers strap (spaced 120º apart) may be used to support vent sections. See Figures 10.8 and 10.9.

Wall shield firestops may be used to provide horizontal support vent sections.

WARNING! Risk of Fire, Explosion or Asphyxiation! Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per in- stallation instructions. DO NOT allow vent to sag below connection point to appliance.

120º

Figure 10.8 Securing Vertical Pipe Sections

120º

Figure 10.9 Securing Horizontal Pipe Sections

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. H • 11/08

35

Image 35
Contents HOT Surfaces What to do if you smell gasXxxxxxxx CongratulationsHomeowner Reference Information User Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingEither cobrahead or SIT Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Minimum Framing DimensionsConstructing the Appliance Chase Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeySLP series vent pipe, if desired Vent Diagrams Top Vent Horizontal TerminationTop Vent Horizontal Termination Three Elbows Break Here ChartH1 Maximum V1 + Minimum Top Vent Vertical Termination Two ElbowsHeat Shield Above First 900 Elbow Vent Clearances and FramingPipe Clearances to Combustibles Non-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Pipe DVP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Securing and Leveling the Appliance Installing the Fiberglass GasketAssemble Pipe Sections Installing Vent PipeAttach Vent to the Firebox Assembly Assemble Vent SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections 10 Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapAnsi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingAppliance Setup Ember Material Install the RefractoryEmber Placement Log #1 SRV2103-107 Install the Log Assembly12 Front View Air Shutter Settings Install the MeshInstall Trim and/or Surround Air Shutter SettingIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Reference Materials Appliance Dimension DiagramDVP vent components Vent Components DiagramsDVP vent components DVP-TRAPNot for use on these models DVP-HSM-BDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Service Parts Log Set AssemblyAt Depot Service Parts ListStocked 6000GCF-IPI Contact Information