Hearth and Home Technologies 6000GCF-IPI Wall Penetration Framing, Combustible Wall Penetration

Page 29

B. Wall Penetration Framing

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

 

 

 

 

 

3 IN. TOP

HEAT

 

 

CLEARANCE

SHIELD

 

 

 

 

 

 

HEAT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHIELD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1 IN. CLEARANCE

WALL

WALL BOTTOM SIDES

SHIELD

 

 

FIRESTOP

 

 

Figure 8.5 Horizontal Venting Clearances to Combustible Materials

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestop(s). The wall shield firestop maintains minimum clearances and prevents cold air infiltration. See Figure 8.6.

The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.

DVP pipe - A wall shield firestop is required on one side only on interior walls. If your local inspector requires a wall shield firestop on both sides, then both wall shield firestops must have a heat shield (refer to Section 16.B.) attached to them.

See Section 10.J. for information for regarding the in- stallation of a horizontal termination cap.

Non-Combustible Wall Penetration

If the hole being penetrated is surrounded by noncom- bustible materials such as concrete, a hole with diameter one inch greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall shield firestop is only required on one side and no heat shield is necessary.

12 in.

10 in.

B

A

A*

B

49-1/2 in,

48-1/2 in,

*Shows center of 10 in. x 12 in. vent framing hole for top venting. The center of the hole is 1 inch above the center of the horizontal vent pipe. With minimum vertical or 6 inch and 90º elbow.

Figure 8.6 Wall Penetration

Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP2110-900 Rev. H • 11/08

29

Image 29
Contents HOT Surfaces What to do if you smell gasXxxxxxxx CongratulationsHomeowner Reference Information User Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsEither cobrahead or SIT Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Minimum Framing DimensionsConstructing the Appliance Chase Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsCombustible Mantels Vent Termination Minimum Clearances Termination Locations= Vent Terminal = AIR Supply Inlet = Area Where Terminal is not PermittedApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsSLP series vent pipe, if desired Vent Diagrams Top Vent Horizontal TerminationTop Vent Horizontal Termination Three Elbows Break Here ChartH1 Maximum V1 + Minimum Top Vent Vertical Termination Two ElbowsHeat Shield Above First 900 Elbow Vent Clearances and FramingPipe Clearances to Combustibles Non-Combustible Wall Penetration Wall Penetration FramingCombustible Wall Penetration Pipe DVP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Attaching Sheetrock Ledges Temporary Access PanelAppliance Preparation Securing and Leveling the Appliance Installing the Fiberglass GasketAttach Vent to the Firebox Assembly Installing Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections 10 Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingApply Sealant TOP & Partial Sides Install RF4-8Heat Shield Requirements for Horizontal Termination Install Vertical Termination CapAnsi Z223.1 and CAN/CGA-B149 installation codes Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Pilot Ignition IPI Wiring Diagram Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingAppliance Setup Ember Material Install the RefractoryEmber Placement Log #1 SRV2103-107 Install the Log Assembly12 Front View Install Trim and/or Surround Install the MeshAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Reference Materials Appliance Dimension DiagramDVP vent components Vent Components DiagramsDVP vent components DVP-TRAPNot for use on these models DVP-HSM-BDVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP Service Parts Log Set AssemblyAt Depot Service Parts ListStocked 6000GCF-IPI Contact Information